Excess E1ectrical Usage Sample Clauses

Excess E1ectrical Usage. The consumption of electricity, including lighting, in excess of five (5) watt▇ ▇▇▇ square foot for any portion of the Demised Premises shall be deemed excessive. Additionally, any individual piece of electrically operated machinery or equipment having a name plate rating in excess of two (2) kilowatts shall also be deemed as requiring excess electric current.

Related to Excess E1ectrical Usage

  • Excess Usage If during a Billing Period, In Energy is greater than zero (0), then Excess Usage for that Billing Period will be calculated. If Excess Usage is greater than zero (0), then for the Facility and any secondary account at the conclusion of that Billing Period: (i) kilowatt-hour usage will equal the value of Excess Usage and (ii) Unused Credits are equal to zero (0). If Excess Usage is equal to zero (0), then for the Facility and secondary accounts at the conclusion of that Billing Period: (i) kilowatt-hour usage is equal to zero (0) and (ii) Unused Credits are reduced by the value of In Energy, determined for that Billing Period, and that reduced value, in accordance with paragraph (C) Unused Credits of this Article IV, will remain for possible future application.

  • Word Usage Words used in the masculine shall apply to the feminine where applicable, and wherever the context of this Agreement dictates, the plural shall be read as the singular and the singular as the plural.

  • Leave Usage Full shift absences on vacation, sick leave, compensating time off, or holiday in lieu taken by employees on scheduled ten-hour workshifts shall result in the deduction of ten (10) hours from employees’ accrued leave balances.

  • Equipment Usage Equipment provided by Sauk County Department of Human Services is the property of Sauk County Department of Human Services. Upon termination of the Contractors employee using the equipment, or termination of the contract between Sauk County DHS and the said Contractor, the equipment must be returned within (5) five working days. If the equipment is damaged or not returned, the Contractor will be held responsible for the replacement cost of the equipment. Sauk County may withhold from future payments the replacement cost of the said equipment or take any other necessary action.

  • Maximum Drawing Amount The maximum aggregate amount that the beneficiaries may at any time draw under outstanding Letters of Credit, as such aggregate amount may be reduced from time to time pursuant to the terms of the Letters of Credit.