Maximum Capacity The Sick Leave Bank shall accumulate unused Bank days from year to year to a maximum capacity which shall not exceed double the number of eligible employees as defined in the above Section C, Eligibility for Membership.
Contract Capacity The electric power producing capability of the Generating Facility which is committed to Edison.
Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as all line-side and trunk-side facilities, plus the features, functions, and capabilities of the switch. The features, functions, and capabilities of the switch shall include the basic switching function of connecting lines to lines, lines to trunks, trunks to lines, and trunks to trunks. Local circuit switching includes all vertical features that the switch is capable of providing, including custom calling, custom local area signalling service features, and Centrex, as well as any technically feasible customized routing functions. 4.2.2 Notwithstanding BellSouth’s general duty to unbundle local circuit switching, BellSouth shall not be required to unbundle local circuit switching for ▇▇▇▇ when ▇▇▇▇: (1) serves an End User with four (4) or more voice-grade (DS0) equivalents or lines served by BellSouth in Zone 1 of one of the following MSAs: Atlanta, GA;
FREQUENCY AND CAPACITY LEVELS No restriction on frequency, capacity or aircraft types
Excess Usage If during a Billing Period, In Energy is greater than zero (0), then Excess Usage for that Billing Period will be calculated. If Excess Usage is greater than zero (0), then for the Facility and any secondary account at the conclusion of that Billing Period: (i) kilowatt-hour usage will equal the value of Excess Usage and (ii) Unused Credits are equal to zero (0). If Excess Usage is equal to zero (0), then for the Facility and secondary accounts at the conclusion of that Billing Period: (i) kilowatt-hour usage is equal to zero (0) and (ii) Unused Credits are reduced by the value of In Energy, determined for that Billing Period, and that reduced value, in accordance with paragraph (C) Unused Credits of this Article IV, will remain for possible future application.