Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Salary Scale The salary scale applicable to Employees shall be set out hereinafter in the Wage Schedule.
COVID-19 Vaccine Passports Pursuant to Texas Health and Safety Code, Section 161.0085(c), Contractor certifies that it does not require its customers to provide any documentation certifying the customer’s COVID-19 vaccination or post-transmission recovery on entry to, to gain access to, or to receive service from the Contractor’s business. Contractor acknowledges that such a vaccine or recovery requirement would make Contractor ineligible for a state-funded contract.
Salary Scales 2.5.1 Effective from 1 January 2024, and subject to the Remuneration provisions in the Terms of Settlement, a 4% increase will apply to all paid and printed rates. The following Allied Divisions shall refer to the applicable schedules for their scales: MIT, UCOL and Otago. 2.5.2 Effective from 1 January 2025, kaimahi will be translated into the following salary scale, which includes the 4% salary increase: Band Step (N/A for UCOL and TOPNZ) Scale Scale 2025 (4%) 40 hours Band Step(N/A for UCOL and TOPNZ Scale 2025 (4%) Scale 2025 (4%)
Interconnection Customer Compensation If the CAISO requests or directs the Interconnection Customer to provide a service pursuant to Articles 9.6.3 (Payment for Reactive Power) or 13.5.1 of this LGIA, the CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff.