Facilities provided by the Contractor Sample Clauses

POPULAR SAMPLE Copied 1 times
Facilities provided by the Contractor. Describe what the Contractor is to provide in the way of Site accommodation, laboratories, storage, vehicles and office equipment etc for the Project Manager and the Supervisor, and any restrictions or minimum requirements concerning the Contractor’s own facilities. State requirements for facilities to be provided by the Contractor such as construction camps. Also state what happens to these facilities upon completion of the contract. Set out constraints, if any, as to the location by the Contractor of such facilities on the Site and requirements for drawings of Site facilities, as necessary.
Facilities provided by the Contractor. The Contractor is to provide the facilities indicated in the Schedule of Quantities. The Contractor shall provide, for the exclusive use of the Engineer and his staff, one office and a toilet (refer to section PSAB). Survey equipment according to clause PSAB6 shall be supplied and maintained for the Engineer's use. The Contractor shall provide, for the exclusive use of the Labour Desk Committee, one office and a toilet (refer to section PSAB). The construction camp location is to be determined in consultation with the Employer, the Employer’s Agent and the local community. The construction camp is to be removed upon completion of the work, and the site returned to the condition in which it was found, to the satisfaction of the Environmental Control Officer.
Facilities provided by the Contractor. The Contractor shall make his own arrangements for the supply of electrical power, water telecommunication services, ablution facilities, sewer services, first aid facilities and other services, the payment thereof and all reinstatements required upon completion. No direct payment will be made to the Contractor for the provision of electrical and other services. The cost thereof shall be deemed to be included in the rates and amounts tendered for the various items of work for which these services are required. The Contractor shall make arrangements at his own cost for telephone and facsimile facilities, with cellular phones being acceptable. Airside permits must be obtained by the Contractor from ACSA in accordance with the requirements of the Contract documents prior to commencing any work.
Facilities provided by the Contractor. The requirements for facilities to be provided by the Contractor for use by the Employer and his agents such as office, ablution and laboratory facilities are stated in Part C3.6, Section A1. 4.7.1. The Contractor shall make his own arrangements for the supply of electrical power, water (see Clause A1.3.3), telecommunication services, ablution facilities, sewer services, first aid facilities and other services, the payment thereof and all reinstatements required upon completion. No direct payment will be made to the Contractor for the provision of electrical and other services. The cost thereof shall be deemed to be included in the rates and amounts tendered for the various items of work for which these services are required. The Contractor will be required to erect a security fence around the construction camp and temporary parking area for plant and equipment. The cost thereof is regarded to be included in the relevant rates for establishment on site. The storage of fuels in tanks may be kept in the Contractor's camp subject to the regulations of the Airport authorities that require a berm or wall around the installation sufficient to retain the capacity fuel of the tanks. The Contractor shall make his own arrangements for telephone and facsimile facilities. Cellular phones will be acceptable, but the Contractor must obtain airside permits from ACSA at his own cost.
Facilities provided by the Contractor. The Contractor provides all required construction facilities for the duration of the works. Facilities provided by the Contractor are to be removed at the end of the works.
Facilities provided by the Contractor.  The Contractor makes provision for accommodation, vehicles, kitchen space, office space (mobile container) and Equipment etc.  The Contractor removes all Equipment used during the installation and commissioning within 24 hours after commissioning.  No spoil areas are provided on site and the Contractor makes arrangements for the disposal of waste.  The Contractor makes arrangements for his own telephone and internet facilities.
Facilities provided by the Contractor. 5.2.1 Contractor‘s yard, offices, workshops and stores
Facilities provided by the Contractor. The Contractor makes provision for accommodation, vehicles, kitchen - and office space (mobile container) and Equipment etc
Facilities provided by the Contractor. The Contractor supplies all plant and materials required for providing the Works. There are no Office or Telephone facilities available on site. The Contractor is to provide his own facilities on site and ensure that these facilities are kept in a clean condition to Eskom’s satisfaction.
Facilities provided by the Contractor a) Site offices i) The Contractor shall provide, for his own use adequate size offices. ii) A cleaning service must also be provided. iii) Domestic rubbish will be removed free of charge. iv) The Contractor shall dismantle and clear off site all such infrastructure at the discretion of the Service Manager on completion of the contract. v) No such dismantling and clearance work shall be carried out without prior approval by the Service Manager. vi) Any electrical equipment or appliances used by the Contractor shall conform to the applicable South African Safety standards and ▇▇▇▇▇ standard PSR 010, and shall be maintained in safe and proper working condition. vii) The Employer shall have the right to stop the Contractor’s use of any electrical equipment or appliance, which in the Employer’s opinion does not conform to the foregoing.