Facility Review Process. The Member acknowledges and agrees that any review or acceptance of such plans, specifications and other information by the Cooperative shall not impose any liability on the Cooperative and does not guarantee the adequacy of the Member’s equipment or the Facility to perform its intended function. The Cooperative disclaims any expertise or special knowledge relating to the design or performance of generating installations and does not warrant the efficiency, cost-effectiveness, safety, durability, or reliability of such Facility. In the event it is necessary at the time of initial interconnection or at some future time for the Cooperative to modify electric delivery systems in order to serve the Member’s Facility and/or purchase or continue to purchase the output of the Member’s Facility, or because the quality of the power provided by the Facility adversely affects the Cooperative’s delivery system, the Member shall: (1) pay the Cooperative in advance for all costs of modifications required for the interconnection of the Facility, (2) modify the Facility as needed, or (3) disconnect the Facility from the Cooperative’s system.

Related to Facility Review Process

  • Review Process A/E's Work Product will be reviewed by County under its applicable technical requirements and procedures, as follows:

  • Review Protocol A narrative description of how the Claims Review was conducted and what was evaluated.

  • Asset Representations Review Process Section 3.01 Asset Representations Review Notices and Identification of Review Receivables. On receipt of an Asset Representations Review Notice from the Seller according to Section 5.7 of the Receivables Purchase Agreement, the Asset Representations Reviewer will start an Asset Representations Review. The Servicer will provide the list of Review Receivables to the Asset Representations Reviewer promptly upon receipt of the Asset Representations Review Notice. The Asset Representations Reviewer will not be obligated to start, and will not start, an Asset Representations Review until an Asset Representations Review Notice and the related list of Review Receivables is received. The Asset Representations Reviewer is not obligated to verify (i) whether the conditions to the initiation of the Asset Representations Review and the issuance of an Asset Representations Review Notice described in Section 7.6 of the Indenture were satisfied or (ii) the accuracy or completeness of the list of Review Receivables provided by the Servicer.

  • Constructability Review Prepare detailed interdisciplinary constructability review within Fourteen (14) days of receipt of the plans from the District that: 10.1.2.1.6.1 Ensures construction documents are well coordinated and reviewed for errors; 10.1.2.1.6.2 Identifies to the extent known, construction deficiencies and areas of concern; 10.1.2.1.6.3 Back-checks design drawings for inclusion of modifications; and 10.1.2.1.6.4 Provides the District with written confirmation that: 10.1.2.1.6.4.1 Requirements noted in the design documents prepared for the Project are consistent with and conform to the District's Project requirements and design standards. 10.1.2.1.6.4.2 Various components have been coordinated and are consistent with each other so as to minimize conflicts within or between components of the design documents.

  • ADB’s Review of Procurement Decisions 11. All contracts procured under international competitive bidding procedures and contracts for consulting services shall be subject to prior review by ADB, unless otherwise agreed between the Borrower and ADB and set forth in the Procurement Plan.