Protocol The attached Protocol shall be an integral part of this Agreement.
System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.
Required Procurement Procedures for Obtaining Goods and Services The Grantee shall provide maximum open competition when procuring goods and services related to the grant- assisted project in accordance with Section 287.057, Florida Statutes.
Signaling protocol 4.1.3.1 SS7 Signaling is AT&T-21STATE’s preferred method for signaling. Where MF signaling is currently used, the Parties agree to use their best efforts to convert to SS7. If SS7 services are provided by AT&T-21STATE, they will be provided in accordance with the provisions of the applicable access tariffs. 4.1.3.2 Where MF signaling is currently used, the Parties agree to interconnect their networks using MF or dual tone MF (DTMF) signaling, subject to availability at the End Office Switch or Tandem Switch at which Interconnection occurs. The Parties acknowledge that the use of MF signaling may not be optimal. AT&T-21STATE will not be responsible for correcting any undesirable characteristics, service problems or performance problems that are associated with MF/SS7 inter-working or the signaling protocol required for Interconnection with CLEC employing MF signaling.
Implementation of and Reporting on the Project A. The Grantee shall implement and complete the Project in accordance with Exhibit A and with the plans and specifications contained in its Grant Application, which is on file with the State and is incorporated by reference. Modification of the Project shall require prior written approval of the State. B. The Grantee shall submit to the State written progress reports until the completion of the Project. These reports shall be submitted upon request by the State and shall contain such detail of progress or performance on the Project as is requested by the State.