TESTING AND INSPECTION 29 6.1 Pre-Commercial Operation Date Testing and Modifications. 29
Tests and Inspections § 15.5.1 Tests, inspections and approvals of portions of the Work shall be made as required by the Design-Build Documents and by applicable laws, statutes, ordinances, codes, rules and regulations or lawful orders of public authorities. Unless otherwise provided, the Design-Builder shall make arrangements for such tests, inspections and approvals with an independent testing laboratory or entity acceptable to the Owner, or with the appropriate public authority, and shall bear all related costs of tests, inspections and approvals. The Design-Builder shall give the Owner timely notice of when and where tests and inspections are to be made so that the Owner may be present for such procedures. The Owner shall bear costs of (1) tests, inspections or approvals that do not become requirements until after bids are received or negotiations concluded, and (2) tests, inspections or approvals where building codes or applicable laws or regulations prohibit the Owner from delegating their cost to the Design-Builder. § 15.5.2 If the Owner determines that portions of the Work require additional testing, inspection or approval not included under Section 15.5.1, the Owner will instruct the Design-Builder to make arrangements for such additional testing, inspection or approval by an entity acceptable to the Owner, and the Design-Builder shall give timely notice to the Owner of when and where tests and inspections are to be made so that the Owner may be present for such procedures. Such costs, except as provided in Section 15.5.3, shall be at the Owner’s expense. § 15.5.3 If such procedures for testing, inspection or approval under Sections 15.5.1 and 15.5.2 reveal failure of the portions of the Work to comply with requirements established by the Design-Build Documents, all costs made necessary by such failure shall be at the Design-Builder’s expense. § 15.5.4 Required certificates of testing, inspection or approval shall, unless otherwise required by the Design-Build Documents, be secured by the Design-Builder and promptly delivered to the Owner. § 15.5.5 If the Owner is to observe tests, inspections or approvals required by the Design-Build Documents, the Owner will do so promptly and, where practicable, at the normal place of testing. § 15.5.6 Tests or inspections conducted pursuant to the Design-Build Documents shall be made promptly to avoid unreasonable delay in the Work.
Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner. 2.1.2 The NYISO and Connecting Transmission Owner shall each provide the Interconnection Customer written acknowledgment that it has received the Interconnection Customer’s written test report. Such written acknowledgment shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by the NYISO or Connecting Transmission Owner of the safety, durability, suitability, or reliability of the Small Generating Facility or any associated control, protective, and safety devices owned or controlled by the Interconnection Customer or the quality of power produced by the Small Generating Facility.
Records; Inspection Artiva shall, and shall cause its Affiliates and Sublicensees to, keep complete, true and accurate books of account and records for the purpose of determining the payments to be made under this Agreement. Such books and records shall be kept for [***] years following the end of the calendar year to which they pertain. Such records shall be open for inspection during such period by independent accountants, solely for the purpose of verifying payment statements hereunder for a period covering not more than [***] months prior to the date of request; provided that no period shall be subject to inspection under this section more than once and inspections with respect to payments on a Product under this Agreement shall be done concurrently with respect to payments on the same Product under the Option Agreement to avoid duplication. Such inspections shall be made no more than once each calendar year, on reasonable notice during normal business hours. The independent accountants will execute a reasonable written confidentiality agreement with Artiva and will disclose to GCLC only such information as is reasonably necessary to provide GCLC with information regarding any actual or potential discrepancies between amounts reported and actually paid and amounts payable under this Agreement. The auditor will send a copy of the report to Artiva at the same time it is sent to GCLC. The report sent to both Parties will include the methodology and calculations used to determine the results. Any unpaid amounts that are discovered shall be paid promptly by Artiva. Inspections conducted under this Section 3.5 shall be at the expense of GCLC, unless the inspection discloses an underpayment by Artiva of [***] or more of the amount due for any period covered by the inspection, whereupon all costs relating to the inspection for such period shall be paid promptly by Artiva. If the inspection discloses an overpayment by Artiva, then Artiva will deduct the amount of such overpayment from amounts otherwise owed to GCLC under this Agreement, unless no further payments are due hereunder, in which case the amount of such overpayment shall be refunded by GCLC to Artiva.
ENTRY AND INSPECTION Lessee shall permit Lessor or Lessor's agents to enter upon the premises at reasonable times and upon reasonable notice, for the purpose of inspecting the same, and will permit Lessor at any time within sixty (60) days prior to the expiration of this lease, to place upon the premises any usual "To Let" or "For Lease" signs, and permit persons desiring to lease the same to inspect the premises thereafter.