Field Laboratory. Design-Build Contractor shall provide for IFA’s use, one Type C field laboratory as specified in Department Standard Specifications 628.02(f). In addition to the provisions of Section 628.02(f) Design-Build Contractor shall provide hot and cold running water (potable), and a portable cook stove for drying samples and with propane in containers of suitable size to be transported to the jobsite. Design-Build Contractor does not need to include telephone lines or telephones in the field laboratory.
Appears in 2 contracts