Common use of FIELD QUALITY CONTROL Clause in Contracts

FIELD QUALITY CONTROL. A. Neither observations by Engineer nor inspections, tests or approvals by other persons shall relieve the Contractor from his obligations to perform the work in accordance with the requirements of the Contract Documents. B. If the Contract Documents, laws, ordinances, rules, regulations or orders of any public authority having jurisdiction require any work to specifically be inspected, tested or approved by some public body, the Contractor shall assume full responsibility therefore, pay all costs in connection therewith, and furnish the Engineer with the required certificates of inspection, testing or approval. C. The Owner reserves the right to independently perform laboratory tests on random samples of material or performance tests on equipment delivered to the site. 1. These tests, if made, will be conducted in accordance with the appropriate referenced standards or specification requirements. 2. The entire shipment represented by a given sample, samples or piece of equipment may be rejected on the basis of the failure of samples or pieces of equipment to meet specified test requirements. 3. All rejected materials or equipment shall be removed from the site, whether stored or installed in the work, and the required replacements shall be made, all at no additional cost to Owner.

Appears in 2 contracts

Sources: Contract, Installation Agreement