Common use of FIELD QUALITY CONTROL Clause in Contracts

FIELD QUALITY CONTROL. A. Special Inspections: Owner will engage a special inspector to perform field tests and inspections and prepare testing and inspection reports. B. Testing Agency: owner will engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports. 1. Testing agency to be responsible for providing curing container for composite samples on Site and verifying that field-cured composite samples are cured in accordance with ASTM C31/C31M. 2. Testing agency to immediately report to Architect, Contractor, and concrete manufacturer any failure of Work to comply with Contract Documents. 3. Testing agency to report results of tests and inspections, in writing, to Owner, Architect, Contractor, and concrete manufacturer within 48 hours of inspections and tests. a. Test reports to include reporting requirements of ASTM C31/C31M, ASTM C39/C39M, and ACI 301, including the following as applicable to each test and inspection: 1) Project name. 2) Name of testing agency. 3) Names and certification numbers of field and laboratory technicians performing inspections and testing. 4) Name of concrete manufacturer. 5) Date and time of inspection, sampling, and field testing. 6) Date and time of concrete placement. 7) Location in Work of concrete represented by samples. 8) Date and time sample was obtained. 9) Truck and batch ticket numbers. 10) Design compressive strength at 28 days. 11) Concrete mixture designation, proportions, and materials. 12) Field test results. 13) Information on storage and curing of samples before testing, including curing method and maximum and minimum temperatures during initial curing period. 14) Type of fracture and compressive break strengths at seven days and 28 days.

Appears in 2 contracts

Sources: Architectural and Engineering Services Agreement, Architectural and Engineering Services Agreement