FIELD QUALITY CONTROL. A. Installers: Submit the following report to the Engineer and system manufacturer: Square footage and location of reinforcing fabric, volume of epoxy adhesive and batch numbers installed each day B. Field Inspection: All aspects of preparation, mixing, and application of materials are subject to field inspection, including the following: a. Material container labels b. Surface Preparation
Appears in 2 contracts