Common use of FIGURES Clause in Contracts

FIGURES. Figure 1 Air Quality and Noise Monitoring Stations for HKBCF Figure 2.1 Water Quality Monitoring Stations (construction phases) before 22 December 2017 Figure 2.2 Water Quality Monitoring Stations (construction phases) after 22 December 2017 Figure 3 Dolphin Monitoring Transect Line and Layout Map TABLE Table 1.1 Contact Information of Key Personnel Table 2.1 Air Quality Monitoring Locations Table 2.2 Action and Limit Levels for 1-hour TSP Table 2.3 Action and Limit Levels for 24-hour TSP Table 3.1 Construction Noise Monitoring Locations Table 3.2 Action and Limit Levels for Construction Noise Table 4.1 Water Quality Monitoring Stations (construction phases) Table 4.2 Action and Limit Levels for Water Quality Table 4.3 Number of Exceedance for Water Quality Monitoring Table 5.1a Action and Limit Levels for Chinese White Dolphin Monitoring – Approach to Define Action Level (AL) and Limit Level (LL) Table 5.1b Action and Limit Levels for Chinese White Dolphin Monitoring - APPENDICES Appendix A Location of Works Areas Appendix B Project Organization for Environmental Works Appendix C Construction Programme Appendix D Event and Action Plan Appendix E Monthly Summery of Waste Flow Table & Monthly Summery of Marine Sediment Appendix F Environmental Licenses and Permits Appendix G Implementation Schedule for Environmental Mitigation Measures (EMIS) Appendix H Statistics on Environmental Complaints, Notification of Summons and Successful Prosecutions Appendix I Environmental Site Inspection Schedule Appendix J Investigation Reports on Action Level or Limit Level Non-compliance This Monthly Environmental Monitoring and ▇▇▇▇▇ (EM&A) Report is prepared for Contract HY/2013/02 “Hong Kong–Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities (HKBCF) – Infrastructure Works Stage I (Western Portion)” (hereafter referred to as “the Contract”) for the Highways Department of Hong Kong Special Administrative Region (HKSAR). The Contract was awarded to China Harbour Engineering Co., Ltd. (hereafter referred to as “the Contractor”) and ETS-Testconsult Limited was appointed as the Environmental Team (ET) by the Contractor. The Contract is part of Hong Kong–Zhuhai–Macao Bridge HKBCF which is a “Designated Project”, under Schedule 2 of the Environmental Impact Assessment Ordinance (EIAO) (Cap 499) and Environmental Impact Assessment (EIA) Report (Register No. AEIAR-145/2009) was prepared for the Project. The current Environmental Permit (EP) No. EP-353/2009/K for HKBCF was issued on 11 April 2016. These documents are available through the EIA Ordinance Register. Site preparation works of the Contract was started on 25 July 2014 and the construction works of the Contract commenced on 24 November 2014. ETS-Testconsult Limited has been appointed by the Contractor to implement the Environmental Monitoring & Audit (EM&A) programme for the Contract in accordance with the Updated EM&A Manual for HKBCF (Version 1.0) and provide environmental team services to the Contract. This is the Thirty-seventh Monthly Environmental Monitoring and Audit (EM&A) Report for the Contract which summaries findings of the EM&A works conducted during the reporting period from 01 December to 31 December 2017.

Appears in 1 contract

Sources: Environmental Monitoring & Audit Report

FIGURES. Figure 1 Air Quality and Noise Monitoring Stations for HKBCF Figure 2.1 Water Quality Monitoring Stations (construction phases) before 22 December 2017 Figure 2.2 Water Quality Monitoring Stations (construction phases) after 22 December 2017 Figure 3 Dolphin Monitoring Transect Line and Layout Map TABLE Table 1.1 Contact Information of Key Personnel Table 2.1 Air Quality Monitoring Locations Table 2.2 Action and Limit Levels for 1-hour TSP Table 2.3 Action and Limit Levels for 24-hour TSP Table 3.1 Construction Noise Monitoring Locations Table 3.2 Action and Limit Levels for Construction Noise Table 4.1 Water Quality Monitoring Stations (construction phases) Table 4.2 Action and Limit Levels for Water Quality Table 4.3 Number of Exceedance for Water Quality Monitoring Table 5.1a Action and Limit Levels for Chinese White Dolphin Monitoring – Approach to Define Action Level (AL) and Limit Level (LL) Table 5.1b Action and Limit Levels for Chinese White Dolphin Monitoring - APPENDICES Appendix A Location of Works Areas Appendix B Project Organization for Environmental Works Appendix C Construction Programme Appendix D Event and Action Plan Appendix E Monthly Summery of Waste Flow Table & Monthly Summery of Marine Sediment Appendix F Environmental Licenses and Permits Appendix G Implementation Schedule for Environmental Mitigation Measures (EMIS) Appendix H Statistics on Environmental Complaints, Notification of Summons and Successful Prosecutions Appendix I Environmental Site Inspection Schedule Appendix J Investigation Reports on Action Level or Limit Level Non-compliance This Monthly Environmental Monitoring and ▇▇▇▇▇ Audit (EM&A) Report is prepared for Contract HY/2013/02 “Hong Kong–Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities (HKBCF) – Infrastructure Works Stage I (Western Portion)” (hereafter referred to as “the Contract”) for the Highways Department of Hong Kong Special Administrative Region (HKSAR). The Contract was awarded to China Harbour Engineering Co., Ltd. (hereafter referred to as “the Contractor”) and ETS-Testconsult Limited was appointed as the Environmental Team (ET) by the Contractor. The Contract is part of Hong Kong–Zhuhai–Macao Bridge HKBCF which is a “Designated Project”, under Schedule 2 of the Environmental Impact Assessment Ordinance (EIAO) (Cap 499) and Environmental Impact Assessment (EIA) Report (Register No. AEIAR-145/2009) was prepared for the Project. The current Environmental Permit (EP) No. EP-353/2009/K for HKBCF was issued on 11 April 2016. These documents are available through the EIA Ordinance Register. Site preparation works of the Contract was started on 25 July 2014 and the construction works of the Contract commenced on 24 November 2014. ETS-Testconsult Limited has been appointed by the Contractor to implement the Environmental Monitoring & Audit (EM&A) programme for the Contract in accordance with the Updated EM&A Manual for HKBCF (Version 1.0) and provide environmental team services to the Contract. This is the Thirty-seventh Monthly Environmental Monitoring and Audit (EM&A) Report for the Contract which summaries findings of the EM&A works conducted during the reporting period from 01 December to 31 December 2017.

Appears in 1 contract

Sources: Environmental Monitoring & Audit Report

FIGURES. Figure 1 Air Quality and Noise Monitoring Stations for HKBCF 1.1 - WSTF Location Map 2 Figure 2.1 Water Quality Monitoring Stations (construction phases) before 22 December 2017 Figure 2.2 Water Quality Monitoring Stations (construction phases) after 22 December 2017 2 - WSTF Organization 4 Figure 3 Dolphin Monitoring Transect Line – Proposed Web Based System 11 Figure 4 - Digital ID Technology 17 ANSI American National Standards Institute BLM Bureau of Land Management BMP Best Management Practices CD-ROM Compact Disk-Read Only Memory CFR Code of Federal Regulations CPG Certified Professional Geologist DP Discharge Plan EA Environmental Assessment EDI Electronic Data Interchange EPA Environmental Protection Agency FIPS Federal Information Processing Standards FTE Full Time Employee GIS Geographic Information System HRMB Hazardous and Layout Map TABLE Table 1.1 Contact Radioactive Materials Bureau HSWA Hazardous and Solid Waste Amendments HTML Hypertext Mark-Up Language ID Identification IE Internet Explorer IRS Internal Revenue Service ISO International Standards Organization ISS Information Services Section ITS Information Technology Section MS Microsoft NASA National Aeronautics and Space Administration NEPA National Environmental Policy Act NFA No Further Action NM New Mexico NMED New Mexico Environment Department NOI Notice of Intent NOD Notice of Deficiency NPDES National Pollutant Discharge Elimination System NSPS New Source Performance Standard PCC Post-Closure Care PE Professional Engineer PKI Public Key Personnel Table 2.1 Air Quality Monitoring Locations Table 2.2 Action Infrastructure RCRA Resource Conservation and Limit Levels Recovery Act RFI RCRA Facility Investigation RSI Request for 1-hour TSP Table 2.3 Action and Limit Levels for 24-hour TSP Table 3.1 Construction Noise Monitoring Locations Table 3.2 Action and Limit Levels for Construction Noise Table 4.1 Water Quality Monitoring Stations (construction phases) Table 4.2 Action and Limit Levels for Water Quality Table 4.3 Number of Exceedance for Water Quality Monitoring Table 5.1a Action and Limit Levels for Chinese White Dolphin Monitoring – Approach to Define Action Level (AL) and Limit Level (LL) Table 5.1b Action and Limit Levels for Chinese White Dolphin Monitoring - APPENDICES Appendix A Location of Works Areas Appendix B Project Organization for Environmental Works Appendix C Construction Programme Appendix D Event and Action Plan Appendix E Monthly Summery of Waste Flow Table & Monthly Summery of Marine Sediment Appendix F Environmental Licenses and Permits Appendix G Implementation Schedule for Environmental Mitigation Measures (EMIS) Appendix H Statistics on Environmental Complaints, Notification of Summons and Successful Prosecutions Appendix I Environmental Site Inspection Schedule Appendix J Investigation Reports on Action Level or Limit Level Non-compliance This Monthly Environmental Monitoring and ▇Supplemental Information ▇▇▇▇ Superfund Amendments and Reauthorization Act SLO State Land Office SSL Secure Sockets Layer SWMU Solid Waste Management Unit SWPPP Storm Water Pollution Prevention Plan TRI Toxic Release Inventory TX Texas URL Uniform Resource Locator (EM&AInternet page address) Report is prepared for Contract HY/2013/02 “Hong Kong–Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities (HKBCF) – Infrastructure Works Stage I (Western Portion)” (hereafter referred to as “the Contract”) for the Highways Department of Hong Kong Special Administrative Region (HKSAR). The Contract was awarded to China Harbour Engineering Co., Ltd. (hereafter referred to as “the Contractor”) and ETS-Testconsult Limited was appointed as the Environmental Team (ET) by the Contractor. The Contract is part of Hong Kong–Zhuhai–Macao Bridge HKBCF which is a “Designated Project”, under Schedule 2 of the Environmental Impact Assessment Ordinance (EIAO) (Cap 499) and Environmental Impact Assessment (EIA) Report (Register No. AEIAR-145/2009) was prepared for the Project. The current Environmental Permit (EP) No. EP-353/2009/K for HKBCF was issued on 11 April 2016. These documents are available through the EIA Ordinance Register. Site preparation works of the Contract was started on 25 July 2014 and the construction works of the Contract commenced on 24 November 2014. ETS-Testconsult Limited has been appointed by the Contractor to implement the Environmental Monitoring & Audit (EM&A) programme for the Contract in accordance with the Updated EM&A Manual for HKBCF (Version 1.0) and provide environmental team services to the Contract. This is the Thirty-seventh Monthly Environmental Monitoring and Audit (EM&A) Report for the Contract which summaries findings of the EM&A works conducted during the reporting period from 01 December to 31 December 2017.WSMR White Sands Missile Range WSTF White Sands Test Facility

Appears in 1 contract

Sources: Final Project Agreement