Final Acceptance of the System. 15.3.1. Following determination of the IAA, at its sole discretion, that the System in each stage successfully passed the Site Acceptance Tests and the Soak Test, the IAA will issue the Supplier with a final acceptance certificate for the System (the "Final Acceptance Certificate" or "COA"). 15.3.2. As a precondition for the issuance of the Final Acceptance Certificate the Supplier shall be required to provide the IAA with the Warranty Guarantee as stipulated in Section 23.3 below, and shall attest in writing that the System and all of its Components conform in all respects to the Supplier's Proposal, the Approved Design Documents, the System Requirements and fully comply with the Technical Specifications and the terms of the Contract, and are free from defects in design, material and workmanship 15.3.3. For the avoidance of doubt, the issuance of any approval, confirmation and acceptance certificate issued by the IAA under this Section 15, shall not derogate from the full and complete responsibility of the Supplier, as stipulated in the Contract, including its responsibility for the design and manufacturing of the System in accordance with the Technical Specifications and its fitness for its intended purpose, and shall not be deemed as a waiver by the IAA of any of its rights under this Contract, including, inter alia, the right to demand from the Supplier to remedy any non-compliance, at its own expenses, even if such non-compliance is discovered after the issuance of the Final Acceptance Certificate.
Appears in 1 contract
Final Acceptance of the System. 15.3.116.4.1. Following determination of In the IAAevent the IAA determined, at in its sole discretion, that the System in each stage successfully passed the Site Acceptance Tests Test and the Soak Test, the IAA will issue the Supplier with a final acceptance certificate for the System (the "Final Acceptance Certificate" or "COA").
15.3.216.4.2. As a precondition for the issuance of the Final Acceptance Certificate the Supplier shall be required to provide the IAA with the Warranty Guarantee as stipulated in Section 23.3 below, and shall attest in writing that the System and all of its Components conform in all respects to the Supplier's Proposal, the Approved Design Documents, the System Requirements and fully comply with the Technical Specifications Requirements and the terms of the Contract, and are free from defects in design, material and workmanship
15.3.316.4.3. For the avoidance of doubt, the issuance of any approval, confirmation and acceptance certificate issued by the IAA under this Section 1516, shall not derogate from the full and complete responsibility of the Supplier, as stipulated in the Contract, including its responsibility for the design and manufacturing of the System in accordance with the Technical Specifications Requirements and its fitness for its intended purpose, and shall not be deemed as a waiver by the IAA of any of its rights under this Contract, including, inter alia, the right to demand from the Supplier to remedy any non-compliance, at its own expenses, even if such non-compliance is discovered after the issuance of the Final Acceptance Certificate.
Appears in 1 contract