Final Design and Construction Documents. JVA will prepare plans and profiles for the entire length of the force main and gravity sewer with connections to the existing collection system, location of air/vac valves at highpoints, manholes and cleanouts. A consistent bury depth will be used and shown on the profiles.
Appears in 1 contract
Final Design and Construction Documents. JVA will prepare plans and profiles for the entire length of the force main and gravity sewer main extension with connections to the existing collection system, location of air/vac valves at highpointsroad crossings, manholes utility crossings, and cleanoutsapproximately 60 manholes. A consistent bury depth will be used and shown on the profiles.