Final Documents. Within 60 days after the Partial Acceptance, the Design-Build Contractor shall furnish IFA final hard copy documentation which shall include, but not be limited to, as-built plans, two copies of as-built plans for traffic signals, engineering reports, design calculations, shop plans, working drawings. Design calculations shall be provided for all bridge structures, earth retaining structures, roadside safety requirements, drainage structures, sign structures and all other items requested by IFA. The final documentation shall include a final list of all items meeting the requirements previously described herein, except that the quantity for each item shall be the final as-built quantity. The final item list shall be submitted in CES format, by Designation Number, with quantity calculations for each item. IFA will prepare the Final Construction Record, which will incorporate the above information along with inspection and test results collected by IFA. The Design-Build Contractor shall submit final documentation for completed work to the IFA onsite personnel for review and concurrence as the work progresses. The final hard copy documentation shall be submitted as one complete package following completion of all construction activity and shall be certified by a professional engineer. All information requested shall be submitted on a CD or DVD to both INDOT Central Office and INDOT Greenfield District.
Appears in 3 contracts
Sources: Public Private Agreement, Public Private Agreement, Public Private Agreement