Final Plans, Specs and CDs Review and Approval Clause Samples

Final Plans, Specs and CDs Review and Approval. The County will review the Final Plans Submittal documents and provide comments and conditional approval. I&L will incorporate the review comments into the approved documents.

Related to Final Plans, Specs and CDs Review and Approval

  • Review and Approval The Supplier confirms and agrees that it shall apply to receive ISR's written consent, wherever ISR's consent, explicitly or implied, is required according to this Agreement. This requirement and the provision of ISR consent, shall not derogate in any way from Supplier's responsibilities and liabilities under this Agreement, and ISR shall bear no responsibility or liability whatsoever in connection with the review (whether or not there are objections) and/or with any approval given to, or denied from, Supplier, with respect to any matter and/or document, including but without limitation, drawings, designs (at all phases), plans, tests or otherwise.

  • Effective Date, Term and Approval This Agreement shall become effective with respect to a Fund, if approved by the shareholders of such Fund, on the Effective Date for such Fund, as set forth in Appendix A attached hereto. If so approved, this Agreement shall thereafter continue in force and effect until June 30, 2021, and may be continued from year to year thereafter, provided that the continuation of the Agreement is specifically approved at least annually: (a) (i) by the Board of Trustees or (ii) by the vote of “a majority of the outstanding voting securities” of such Fund (as defined in Section 2(a)(42) of the ▇▇▇▇ ▇▇▇); and (b) by the affirmative vote of a majority of the trustees who are not parties to this Agreement or “interested persons” (as defined in the ▇▇▇▇ ▇▇▇) of a party to this Agreement (other than as trustees of the Trust), by votes cast in person at a meeting specifically called for such purpose.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities (including required control technologies and protection systems) and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer’s Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Inspection and Approval ▇▇▇▇▇▇ agrees that OUSD has the right and agrees to provide OUSD with the opportunity to inspect any and all aspects of the SERVICES performed including, but not limited to, any materials (physical or electronic) produced, created, edited, modified, reviewed, or otherwise used in the preparation, performance, or evaluation of the SERVICES. In accordance with Paragraph 3 (Compensation), the SERVICES performed by VENDOR must meet the approval of OUSD, and OUSD reserves the right to direct VENDOR to redo the SERVICES, in whole or in part, if OUSD, in its sole discretion, determines that the SERVICES were not performed in accordance with this AGREEMENT.

  • Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.