Finishing Sample Clauses
The FINISHING clause outlines the requirements and standards for completing the final stages of a project or work, ensuring that all aspects are properly concluded. It typically specifies the quality of workmanship, the materials to be used, and the procedures for addressing any defects or incomplete items before final acceptance. By clearly defining expectations for the project's completion, this clause helps prevent disputes over unfinished or substandard work and ensures that the end result meets the agreed-upon standards.
POPULAR SAMPLE Copied 1 times
Finishing. All internal walls will be finished with cement plaster and putty finished over it. Exterior wall will be finished with cement plaster and the surface will be treated with decorative cement-based paint.. Veranda will be provided with M.S. grill as per plan and Staircase will be provided with M.S. railing or any others better option up to 32” height.
Finishing. The Aircraft will be delivered to Buyer as follows:
Finishing. The [*] will be delivered to Buyer as follows:
Finishing. (i) The type of finish for formed concrete surfaces shall be as follows, unless varied by the Engineer.
(ii) When the structure is in service all the surfaces shall receive no special finish, except repair of damaged or defective concrete, removal of fine and abrupt irregularities, filling defective concrete, removal of fins and abrupt irregularities, filling of holes left by form ties and rods and clean up of loose or adhering debris.
(iii) Surfaces which will be exposed to the weather and which would normally be level, shall be sloped for drainage. Unless a horizontal surface or the slope required is specified, the tops of narrow surfaces such as stair treads, walls, curbs and parapets shall be sloped across the width approximately 1 in 30. Broader surfaces such as walkways, roads, parking areas and platforms shall be sloped about 1 in 50. Surfaces that will be covered by backfill or concrete, sub floors to be covered with concrete topping, terrazzo or quarry tiles, and similar surfaces shall be smooth screeded and levelled to produce even surfaces. Surface irregularities shall not exceed 6 mm. Surfaces which will not be covered by backfill, concrete or tile toppings such as outside decks, floors of galleries and sumps, parapets, gutters, side-walks, floors and slabs, shall be consolidated, screeded and floated. Excess water and laitance shall be removed before final finishing. Floating may be done with hand or power tools and
Finishing. Remove protection; make good damage to this and adjacent work.
Finishing. Sterilised bags are visually inspected for unusual appearance and packaged in cartons.
Finishing a) All interior surface shall have sand-cement finished with plaster of paris only.
b) All exterior surface wall shall have painted with weather coat of approved shade.
c) Overhead and underground tank as per sanction plan which should be adequate to fulfil at the requisite of Flat Owners.
d) Half grill will be fitted in the hanging Verandah.
Finishing. Walls, baseboards and other surfaces shall be free of finishing residue and marks from the equipment. Floors shall be free from streaks, mop strand marks and skipped areas.
Finishing. A. Repair of surface defects: The repair of defects in formed surfaces and filling of tie holes shall proceed immediately after the removal of forms (see Form Work). The work shall conform to ACI 301, Chapter 9, except that, when approved by the Engineer, honeycombed areas may be repaired as approved by the Engineer. All fins and projections shall be removed and irregular areas smoothed with carborundum stones, as approved.
1. Existing concrete shall be patched as required, using concrete bonding agent.
B. Flat work: Flat work includes new oil tank pads, concrete aprons, and other flat concrete surfaces. Flat work shall conform with ACI 301, Chapter 11. Finish to be as follows:
1. All flat work shall be broom finished.
Finishing. Pass the finishing machine or approved screeding device over the existing deck prior to placing the concrete overlay in order that measurements can be made to insure that proper overlay thickness and steel cover is achieved. Equip screeds with surface vibrators sufficient to thoroughly consolidate the overlay full depth, unless other methods are approved by the Engineer. Perform consolidation using hand-held vibrators when placing the mixture around steel reinforcement or structural members.