Fire flow Sample Clauses

Fire flow. All on-site fire hydrants shall flow a minimum of 1,250 gallons per minute at 20 psi for a duration of two hours. If more than one on-site fire hydrant is required, the on-site fire flow shall be at least 2,500 gallons per minute at 20 psi, flowing from two hydrants simultaneously. On site flow may be greater depending upon the size of the structure and the distance from public hydrants. NOTE: ONE OF THE TWO HYDRANTS TESTED SHALL BE THE FARTHEST FROM THE PUBLIC WATER SOURCE.
Fire flow. Owner is responsible for ensuring that the design fire flow for the Port’s Water System is adequate for Owner’s proposed development and construction. If Owner seeks fire flow greater than the current system design, Owner may request that the Port improve the Water System to provide increased fire flow by submitting a request in writing to the Port. The Port will determine, in its sole discretion, whether to pursue the requested water system improvements to increase fire flow and approve Owner’s request. Owner shall not apply for or seek approval of proposed uses or development of the Property requiring fire flow greater than the system design fire flow, unless and until the Port has approved in writing and implemented the requested water system improvements to increase fire flow.
Fire flow. The ability of the system to meet a design fire flow rate for the design period and meet maximum day demand with the largest well out of service. A common design fire flow is 3,500 gpm for 3 hours.
Fire flow. The Developer is responsible for providing water system 533 improvements, at its sole cost and expense, for the Project adequate to meet the City’s fire flow 534 requirements. All water system design and construction shall meet City standards, and require 535 City review and approval. 536 537 538 SECTION 12 SANITARY SEWERS 539
Fire flow. Condition 18 of the PD Permit is a General Requirement.

Related to Fire flow

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Fire Suppression Costs Purchaser’s obliga- tions for cost of fire suppression vary according to three classifications of fires as follows:

  • Bandwidth the amount of data (quantified as “Mbps” or “Gbps”) made available to Customer as specified in a Service Order.

  • Floor Load Tenant shall not place a load upon any floor of the Premises that exceeds 50 pounds per square foot “live load”. Landlord reserves the right to reasonably designate the position of all Equipment which Tenant wishes to place within the Premises, and to place limitations on the weight thereof.