FLOOR SLAB. The following is subject to structural requirements unknown at the time of authoring these specifications. Floor slab to be determined by soils and structural engineers. Floor slab to be a hard trowel finish. Control joints will be caulked. Floor will be installed utilizing a laser screed operation.
Appears in 2 contracts
Sources: Office and Warehouse Lease, Office and Warehouse Lease (Tilly's, Inc.)