Common use of Force Majeure Clause in Contracts

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 686 contracts

Sources: Regional Cooperative Agreement, Job Order Contract for Pavement Maintenance Services, Job Order Contract

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties be found in breach during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 115 contracts

Sources: Contract Ma 060 22011634, Webeoc Enterprise Software Maintenance, Contract for Qtof Sciex Instrument Service and Maintenance

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 thirty-six (36) hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 90 contracts

Sources: Claims Administration Agreement, Electronic Health Records System Maintenance and Support Services, Software License Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties in breach of this Contract during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 65 contracts

Sources: Life and Accidental Death and Dismemberment Insurance Coverage, Life and Accidental Death and Dismemberment Insurance Coverage, Total Self Service Benefits Administrator Contract

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 thirty six (36) hours of the start of the delay and Contractor avails himself itself of any available remedies.

Appears in 21 contracts

Sources: Urinalysis Laboratory Testing Services, Contract for Electronic Health Record System Maintenance and Support, Laboratory Supplies Contract

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 thirty-six (36) hours of the start of the delay and Contractor avails himself itself of any available remedies.

Appears in 17 contracts

Sources: Diagnostic Testing Services Agreement, Contract for Services, Contract for Continuum of Care – Point in Time Count

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.thirty-six

Appears in 16 contracts

Sources: Contract, Contract for Continuous Electronic Monitoring Services, Independent Auditing and Related Services Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County and District within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 12 contracts

Sources: Fuel Modification, Mowing/Discing, Fire Hazard and Weed Abatement Contract, Mitigation Maintenance Services Contract, Disaster Related Debris Management Services

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself itself of any available remedies.

Appears in 12 contracts

Sources: Evaluation Contract, Continuum of Care Homeless Emergency Aid Program, Continuum of Care Homeless Emergency Aid Program

Force Majeure. Contractor shall not be in breach of this Contract and assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to the County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 10 contracts

Sources: Claims Administration Agreement, Claims Administration Agreement, Employee Assistance Program Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 (thirty-six) hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 9 contracts

Sources: Contract for Bird Abatement Services, Contract, Contract for Bird Abatement Services

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties in breach of this Contract during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any reasonably available remedies.

Appears in 7 contracts

Sources: Administration of a Prescription Drug Card and Mail Order Program Contract, Administration of a Prescription Drug Card and Mail Order Program, Administration of a Prescription Drug Card and Mail Order Program Contract

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties or be found in breach during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 7 contracts

Sources: Contract Ma 060 23010019, Contract Ma 060 23010019, Elevator/Escalator Preventive Maintenance Services

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County and/or District within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 5 contracts

Sources: Environmental Multi Purpose Maintenance Contract, Environmental Multi Purpose Maintenance Contract, Environmental Multi Purpose Maintenance Contract

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County City within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 4 contracts

Sources: Contract for Fire Apparatus and Related Vehicles, Contract for Ambulances, Ems, and Special Service Vehicles, Contract for Water Meters

Force Majeure. Contractor shall not be in breach of this Contract and assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to the County within 36 hours of the start of the delay and Contractor avails himself of any reasonably available remedies.

Appears in 4 contracts

Sources: Health Reimbursement Arrangement Administration Agreement, Contract for Administration of a Health Reimbursement Arrangement Program, Contract for Administration of a Health Reimbursement Arrangement Program

Force Majeure. Contractor shall not be in breach of this Contract or assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 thirty- six (36) hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 3 contracts

Sources: Contract for Services, High and Medium Voltage Equipment Maintenance and Repair Agreement, Body Transportation Services Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused contract by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor the contractor gives written notice of the cause of the delay to County the District within 36 hours ten (10) days of the start of the delay and Contractor the contractor avails himself of any available remedies.

Appears in 3 contracts

Sources: Contract, Contract, Contract

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 3 contracts

Sources: Managed Security Services Agreement, Emergency Contract, Maintenance and Repair Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 thirty- six (36) hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 3 contracts

Sources: Cybersecurity Assessment & Audit Services, Cybersecurity Assessment & Audit Services, Regional Cooperative Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages any damages, liability, or unsatisfactory performance penalties during or as a result of any delay beyond the time named for the performance of this Contract Contract, or any other breach of this Agreement, to the extent caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any reasonably available remedies.

Appears in 2 contracts

Sources: Contract, Contract

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours 5 business days of the start of the delay and Contractor avails himself of any available remedies.

Appears in 2 contracts

Sources: Population Health and Equity Partnership Services, Population Health and Equity Partnership Services

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike strike, epidemic, pandemic quarantine or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 2 contracts

Sources: Contract Ma 031 21011546, Hardware Maintenance and Software Licensing Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties nor deemed to have violated its obligations under the Contract during or as the result of any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any commercially reasonable and available remedies.

Appears in 2 contracts

Sources: Master Agreement, Master Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.to

Appears in 2 contracts

Sources: Regional Cooperative Agreement, Software Licensing, Maintenance and Support Services

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 2 contracts

Sources: Contract for Legal Process Services, Contract for Legal Process Services

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours 5 business days of the start of the delay and Contractor avails himself of any reasonably available remedies.

Appears in 2 contracts

Sources: Contract, Contract for Automated Civil System

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.County

Appears in 2 contracts

Sources: Subordinate Agreement, Advertising, Marketing & Public Relations Services Agreement

Force Majeure. Contractor shall not be held liable and shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 2 contracts

Sources: Contract Ma 031 21011799, Equipment Storage, Delivery & Pick Up Contract

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours five (5) business days of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Public Opinion Survey Services Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike strike, lockouts, riots, floods, fires, lightning, or other cause beyond its reasonable control, including interruptions in telephone service, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Monitor and Repair of Intrusion Systems

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours five (5) business days of the start of the delay and Contractor avails himself itself of any reasonably available remedies.

Appears in 1 contract

Sources: Digital Media Marketing Campaign Professional Services

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County Public Authority within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Contract

Force Majeure. Contractor shall not be assessed with liquidated damages any damages, liability, or unsatisfactory performance penalties during or as a result of any delay beyond the time named for the performance of this Contract Contract, or any breach of this Agreement, caused by any act of God, war, civil disorder, employment strike strike, or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any commercially reasonably available remedies.

Appears in 1 contract

Sources: Contract for Web Application Services

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remediesavailableremedies.

Appears in 1 contract

Sources: Parking Access and Revenue Control System Equipment, Maintenance and Repair

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 thirty- six (36) hours of the start of the delay and Contractor avails himself itself of any available remedies.

Appears in 1 contract

Sources: Fundraising Services Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike strike, or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Language Interpretation and Translation Services Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike strike, labor difficulties (as described in the section entitled Breach of Contract) , or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Sponsorship Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract Agreement caused by any act of God, war, terrorist activity, epidemic, curtailment of transportation services, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself itself of any available remedies.

Appears in 1 contract

Sources: Purchase Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike strike, or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 thirty six (36) hours of the start of the delay and Contractor avails himself itself of any available remedies.

Appears in 1 contract

Sources: Contract for Electronic Nurse Case Management System

Force Majeure. Contractor ContractorCONTRACTOR shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract ContractCONTRACT caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor ContractorCONTRACTOR gives written notice of the cause of the delay to County CountyCOUNTY within 36 hours of the start of the delay and Contractor ContractorCONTRACTOR avails himself of any available remedies.

Appears in 1 contract

Sources: Maintenance Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties or be found in breach during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike strike, pandemic, epidemic, natural disaster or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Automated Food Service System Software Maintenance and Support Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 (thirty- six) hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Landfill Gas Services Contract

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties penalties, or be deemed to be in breach of contract, during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself itself of any available remedies.

Appears in 1 contract

Sources: Pharmacy Benefits Manager Services Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 72 hours of or as soon as is reasonably possible following the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Contract for Equal Employment Opportunity Training Services

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 business hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Regional Cooperative Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Truncation and Software Maintenance Services

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract Contrac t caused by any act of God, war, civil disorder, employment strike strike, or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Language Interpretation and Translation Services Agreement

Force Majeure. Contractor shall not be in breach of this Contract assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Administrative Services Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike strike, or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours a commercially reasonable period after of the start of the delay and Contractor avails himself itself of any available remedies.

Appears in 1 contract

Sources: Contract for Commercial Valuation Software, Installation, and Support

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County City within 36 hours of Contractor’s actual knowledge of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Contract for Removal and Replacement of Escalator Steps

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours ten (10) business days of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Contract for Water Treatment Chemicals and Related Services

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County District within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Real Estate Disposition Services Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties nor deemed to have violated its obligations under the Contract during or as a result of any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any commercially reasonable and available remedies.

Appears in 1 contract

Sources: Maintenance and Support Agreement

Force Majeure. Contractor shall not be assessed with liquidated liable for damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 thirty-six (36) hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Contract for Youth Diversion Counseling Services

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties (if applicable because specified in this Contract) or otherwise be in breach during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 thirty-six (36) hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Sales Contracts

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of as soon as reasonably practicable the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Employee Health Software Solution Contract

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, pandemic, employment strike strike, or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours 72hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Contract for Technical Assistance Services

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, disease, pandemic or other health emergency, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 thirty-six (36) hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Life and Accidental Death and Dismemberment Insurance Coverage

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance performace penalties in breach of this Contract during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 thirty-six (36) hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Help Desk Services Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 thirty-six (3)6 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Blood Alcohol Testing Agreement

Force Majeure. R. : Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

Appears in 1 contract

Sources: Contract

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives Contractorgives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails Contractoravails himself of any available remedies.

Appears in 1 contract

Sources: Provision of Long Term Disability Insurance Plan and Administration of Short Term Disability Insurance Plan and Reserve Deputy Sheriff Disability Income Protection Plan

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself itself of any available remedies.

Appears in 1 contract

Sources: Year Round Emergency Shelter/Multi Service Center Program Agreement

Force Majeure. Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties penalties, or be deemed to be in breach of contract, during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written notice of the cause of the delay to County within 36 thirty-six (36) hours of the start of the delay and Contractor avails himself itselfhimself of any available remedies.

Appears in 1 contract

Sources: Pharmacy Benefits Manager Services Agreement