Form Work. Form work shall conform to the slope lines, curvature and dimensions of concrete and RCC structure as shown in the relevant drawings. Form work for concrete shall be plywood, steel plates, seasoned timber or other approved materials as per directions of the Engineer. It shall besufficiently tightened to prevent loss of cement slurry and all holes and joints shall be chaulked with putty. For casting R.C.C. slab polythene sheet may have to be used to prevent leakage as advised by the Engineer Incharge for which no extra payment will be made to the Contractor.
Appears in 2 contracts
Sources: Works Contract, Works Contract