FRAMEWORK PERIOD. 8.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either: 8.1.1 at the end of the Initial Framework Period; or 8.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 below, at the end of the Extension Framework Period, 8.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law. 8.2 The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 24 contracts
Sources: Framework Agreement, Framework Agreement, Corporate Software Solutions Framework Agreement
FRAMEWORK PERIOD. 8.1 38.1. This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 38.1.1. at the end of the Initial Framework Period; or
8.1.2 38.1.2. where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 38.1 below, at the end of the Extension Framework Period,
8.1.3 38.1.3. unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 38.2. The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 16 contracts
Sources: Framework Agreement, Framework Agreement, Framework Agreement
FRAMEWORK PERIOD. 8.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 : at the end of the Initial Framework Period; or
8.1.2 or where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 10.2 below, at the end of the Extension Framework Period,
8.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 , The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) one year (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 12 contracts
Sources: Language Services Framework Agreement, Language Services Framework Agreement, Framework Agreement
FRAMEWORK PERIOD. 8.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 : at the end of the Initial second (2nd) Contract Year (the initial Framework PeriodPeriod ); or
8.1.2 or where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 10.1 below, at the end of the Extension extended Framework Period,
8.1.3 , unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 . The Authority may extend the duration of this Framework Agreement for any period or periods of up to twelve (12) months at a time subject to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 11 contracts
Sources: Framework Agreement, Framework Agreement, Framework Agreement
FRAMEWORK PERIOD. 8.1 10.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 10.1.1 at the end of the Initial second (2nd) Contract Year (the initial Framework PeriodPeriod ); or
8.1.2 10.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 10.1 below, at the end of the Extension extended Framework Period,
8.1.3 10.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 10.2 The Authority may extend the duration of this Framework Agreement for any period or periods of up to twelve (12) months at a time subject to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 8 contracts
Sources: Framework Agreement for the Supply of Non Medical Non Clinical (Nmnc) Temporary and Fixed Term Staff, Framework Agreement for the Supply of Non Medical Non Clinical Temporary and Fixed Term Staff, Framework Agreement for the Supply of Non Medical Non Clinical (Nmnc) Temporary and Fixed Term Staff
FRAMEWORK PERIOD. 8.1 9.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 9.1.1 at the end of the Initial Framework Period; or
8.1.2 9.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 9.2 below, at the end of the Extension Framework Period,
8.1.3 9.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 9.2 The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) one (1+1) years year in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 5 contracts
Sources: Vehicle Lease and Fleet Management Framework Agreement, Vehicle Lease and Fleet Management Framework Agreement, Vehicle Lease and Fleet Management Framework Agreement
FRAMEWORK PERIOD. 8.1 10.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 at the end of the Initial Framework Period; or
8.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 belowexpire, at the end of the Extension Framework Period,
8.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law, either
10.1.1 at the end of the Initial Framework Period; or
10.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 10.2 below, at the end of the Extension Framework Period.
8.2 10.2 The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) one (1+1) years year in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 4 contracts
Sources: Framework Agreement for Services, Framework Agreement, Framework Agreement
FRAMEWORK PERIOD. 8.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 at the end of the Initial Framework Period; or
8.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 belowexpire, at the end of the Extension Framework Period,
8.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 , either at the end of the Initial Framework Period; or where the Authority elects to extend the Initial Framework Period in accordance with Clause 10.2 below, at the end of the Extension Framework Period. The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 4 contracts
Sources: Framework Agreement, Framework Agreement, Framework Agreement
FRAMEWORK PERIOD. 8.1 10.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 at the end of the Initial Framework Period; or
8.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 belowexpire, at the end of the Extension Framework Period,
8.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law, either
10.1.1 at the end of the Initial Framework Period; or
10.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 10.2 below, at the end of the Extension Framework Period.
8.2 10.2 The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three one (31) Months' written notice.
Appears in 3 contracts
Sources: Framework Agreement, Framework Agreement, Framework Agreement
FRAMEWORK PERIOD. 8.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 : at the end of the Initial Framework Period; or
8.1.2 or where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 8.12 below, at the end of the Extension Framework Period,
8.1.3 , unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 . The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 3 contracts
Sources: Framework Agreement, Framework Agreement, Framework Agreement
FRAMEWORK PERIOD. 8.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 : at the end of the Initial Framework Period; or
8.1.2 or where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 8.1 below, at the end of the Extension Framework Period,
8.1.3 , unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 . The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 3 contracts
Sources: Managed Email Framework Agreement, Managed Email Framework Agreement, Enterprise Application Support Services Framework Agreement
FRAMEWORK PERIOD. 8.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 at the end of the Initial Framework Period; or
8.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 8.1 below, at the end of the Extension Framework Period,
8.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 2 contracts
Sources: Managed Email Framework Agreement, Framework Agreement
FRAMEWORK PERIOD. 8.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 at the end of the Initial Framework Period; or
8.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 below, at the end of the Extension Framework Period,
8.1.3 , unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 2 contracts
Sources: Framework Agreement, Framework Agreement
FRAMEWORK PERIOD. 8.1 10.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 at the end of the Initial Framework Period; or
8.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 belowexpire, at the end of the Extension Framework Period,
8.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law, either
10.1.1 at the end of the Initial Framework Period; or
10.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 10.2 below, at the end of the Extension Framework Period.
8.2 10.2 The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 2 contracts
Sources: Framework Agreement for the Provision of Apprenticeship Training and Related Services, Framework Agreement for the Provision of Apprenticeship Training and Related Services
FRAMEWORK PERIOD. 8.1 9.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 9.1.1 at the end of the Initial second (2nd) Contract Year (the initial Framework PeriodPeriod ); or
8.1.2 9.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 9.1 below, at the end of the Extension extended Framework Period,
8.1.3 9.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 9.2 The Authority may extend the duration of this Framework Agreement for any period or periods of up to twelve (12) months at a time subject to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 2 contracts
Sources: Framework Agreement for the Supply of Non Medical Non Clinical (Nmnc) Temporary and Fixed Term Staff, Framework Agreement for the Supply of Non Medical Non Clinical (Nmnc) Temporary and Fixed Term Staff
FRAMEWORK PERIOD. 8.1 10.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire expire, either:
8.1.1 10.1.1 at the end of the Initial Framework Period; or
8.1.2 10.1.2 where the Authority elects to extend the Initial duration of this Framework Period Agreement in accordance with Clause 8.2 10.3 below, at the end of the Extension Framework Period,.
8.1.3 unless 10.2 Notwithstanding clause 10.1 above, this Framework Agreement shall expire where it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 10.3 The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years one year in total (each an “Extension Period”) and from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written noticenotice prior to the date of expiry of the Initial Framework Period .
Appears in 2 contracts
Sources: Framework Agreement, Framework Agreement
FRAMEWORK PERIOD. 8.1 9.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 9.1.1 at the end of the Initial Framework Period; or
8.1.2 9.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 9.2 below, at the end of the Extension Framework Period,
8.1.3 9.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 9.2 The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 1 contract
Sources: Framework Agreement
FRAMEWORK PERIOD. 8.1 10.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 at the end of the Initial Framework Period; or
8.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 belowexpire, at the end of the Extension Framework Period,
8.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law, either
10.1.1 at the end of the Initial Framework Period; or
10.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 10.1 below, at the end of the Extension Framework Period.
8.2 10.2 The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' Months written notice.
Appears in 1 contract
Sources: Framework Agreement
FRAMEWORK PERIOD. 8.1 10.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 at the end of the Initial Framework Period; or
8.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 belowexpire, at the end of the Extension Framework Period,
8.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law, either:
10.1.1 at the end of the Initial Framework Period; or
10.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 10.2 below, at the end of the Extension Framework Period.
8.2 10.2 The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 1 contract
Sources: Framework Agreement for Services
FRAMEWORK PERIOD. 8.1 10.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 at the end of the Initial Framework Period; or
8.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 belowexpire, at the end of the Extension Framework Period,
8.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law, either
10.1.1 at the end of the Initial Framework Period; or
10.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 10.2 below, at the end of the Extension Framework Period.
8.2 10.2 The Authority may extend the duration of this Framework Agreement twice, each extension to last for any period or periods one (1) year only, up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Period. The Supplier must be given no less than three (3) Months' Months written noticenotice for each one (1) year extension permitted under this Framework.
Appears in 1 contract
Sources: Framework Agreement
FRAMEWORK PERIOD. 8.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 at the end of the Initial Framework Period; or
8.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 8.12 below, at the end of the Extension Framework Period,
8.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 1 contract
Sources: Ict Services Framework Agreement
FRAMEWORK PERIOD. 8.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 : at the end of the Initial Framework Period; or
8.1.2 or where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 below, at the end of the Extension Framework Period,
8.1.3 , unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 . The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 1 contract
Sources: Framework Agreement
FRAMEWORK PERIOD. 8.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 at 8.1. 1at the end of the Initial Framework Period; or
8.1.2 where 8.1. 2where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 8.1 below, at the end of the Extension Framework Period,
8.1.3 unless 8.1. 3unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 1 contract
Sources: Managed Email Framework Agreement
FRAMEWORK PERIOD. 8.1 10.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 10.1.1 at the end of the Initial Framework Period; or
8.1.2 10.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 10.1 below, at the end of the Extension Framework Period,
8.1.3 10.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 10.2 The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) one (1+1) years year in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 1 contract
Sources: Framework Agreement
FRAMEWORK PERIOD. 8.1 37.1. This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 37.1.1. at the end of the Initial Framework Period; or
8.1.2 37.1.2. where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 37.1 below, at the end of the Extension Framework Period,
8.1.3 37.1.3. unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 37.2. The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two (2) (1+1) years Years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 1 contract
Sources: Framework Agreement
FRAMEWORK PERIOD. 8.1 10.1 This Framework Agreement shall take effect on the Framework Commencement Date and shall expire either:
8.1.1 10.1.1 at the end of the Initial Framework Period; or
8.1.2 10.1.2 where the Authority elects to extend the Initial Framework Period in accordance with Clause 8.2 10.1 below, at the end of the Extension Framework Period,
8.1.3 10.1.3 unless it is terminated earlier in accordance with the terms of this Framework Agreement or otherwise by operation of Law.
8.2 10.2 The Authority may extend the duration of this Framework Agreement for any period or periods up to a maximum of two one (2) (1+1) years in total from the expiry of the Initial Framework Period by giving the Supplier no less than three (3) Months' written notice.
Appears in 1 contract