Frequency Control Sample Clauses

Frequency Control. ZESA and ZESCO NCCs will consult each other and agree on the expected load and station loading patterns each week for the week following. ZESA NCC will issue operating instructions on a day to day basis to stations in Zimbabwe as will ZESCO NCC in Zambia. Minute by minute frequency control will be done by Kafue Gorge or Kariba South depending on which station is agreed to be on the best position to do so. The time error should not exceed plus or minus 10 seconds.
Frequency Control. Both Parties shall operate and maintain their systems to enable the Avista control area to maintain its frequency control obligations to applicable regional operating criteria.
Frequency Control o Provide full active power when the frequency is below 49.5 Hz; ▪ Minimum time for maximum power: 0.5 seconds; ▪ Limited to maximum allowable voltage; ▪ Limited to the power transit on transforming station; o No active power when the frequency is higher than 50.5 Hz. ● Load/production support: o Smoothing of load and output at the transformer output (low voltage);
Frequency Control. GBX project shall comply with following (please note, some of them states same set of requirements however for avoidance of doubt all possible references are included that are to be complied):

Related to Frequency Control

  • Emergency Contact CONTRACTOR shall have a responsible person available at, or reasonably near, the Project/Service on a twenty-four (24) hour basis, seven (7) days a week, who may be contacted in emergencies and in cases where immediate action must be taken to handle any problem that might arise. CONTRACTOR shall submit to the COUNTY’s Project Manager, the phone numbers and names of personnel designated to be contacted in cases of emergencies. This list shall contain the name of their supervisors responsible for work pertaining to this Agreement.

  • Emergency Contacts Contractor shall provide County with a list of names and telephone numbers at which Contractor’s representative, alternate, superintendent, and other key personnel can be reached during non-working hours in the case of an emergency.

  • EMERGENCY CONTRACTS In the event that a disaster emergency is declared by Executive Order under Section 28 of Article 2-B of the Executive Law, or the Commissioner determines pursuant to his/her authority under Section 163(10)(b) of the State Finance Law that an emergency exists requiring the prompt and immediate delivery of Product, the Commissioner reserves the right to obtain such Product from any source, including but not limited to this Contract(s), as the Commissioner in his/her sole discretion determines will meet the needs of such emergency. Contractor shall not be entitled to any claim or lost profits for Product procured from other sources pursuant to this clause. The reasons underlying the finding that an emergency exists shall be included in the procurement record.

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Emergency Calls IP Phones need an additional power supply to operate. In the event of a power failure it is your responsibility to ensure you have the means to make emergency calls. In accordance with paragraph 13.2, we will not be liable for any loss or damage (financial or otherwise) where you fail to do so.