Functional defects Sample Clauses

A 'Functional defects' clause defines the parties' responsibilities and remedies regarding defects that prevent a product or service from performing its intended functions. Typically, this clause outlines the process for identifying, reporting, and rectifying such defects, often specifying timeframes for notification and repair or replacement. Its core practical function is to ensure that the delivered product or service meets agreed-upon functional requirements, providing a clear mechanism for addressing failures and protecting the buyer from receiving non-functional or substandard deliverables.
Functional defects. The criteria for Minor Defects are as follows: (1) 1 or more scratch, crack, or other damaged on front face which is visible at 50cm. (2) 1 or 2 scratches, crack, or other damage on side, back, or top face which is visible at 50cm. (3) Multiple scratches, cracks, or other damage to the bottom of the base. (4) 1 or more spots on the front, top, or side face with a diameter greater than 0.6<D<1.0mm. (5) 2 or more spots on the front, top, or side face with 0.4<D<0.6mm. (6) 3 or more spots on the front, top, or side face with 0.2<D<0.4mm. (7) 5 or more spots on the front, top, or side face with D<0.2mm. (8) Missing, incorrect, or loose screws which do not affect appearance, function, or safety. (9) Screws which have been damaged but can be removed using standard tools. (10) Damaged power cord, which does not expose conductors.
Functional defects. The criteria for Minor Defects are as follows: (1) 1 or more scratch, crack, or other damaged on front face which is visible at 50cm. (2) 1 or 2 scratches, crack, or other damage on side, back, or top face which is visible at 50cm. (3) Multiple scratches, cracks, or other damage to the bottom of the base. (4) 1 or more spots on the front, top, or side face with a diameter greater than 0.6<D<1.0mm. (5) 2 or more spots on the front, top, or side face with 0.4<D<0.6mm. (6) 3 or more spots on the front, top, or side face with 0.2<D<0.4mm. (7) 5 or more spots on the front, top, or side face with D<0.2mm. (8) Missing, incorrect, or loose screws which do not affect appearance, function, or safety. (9) Screws which have been damaged but can be removed using standard tools. (10) Damaged power cord, which does not expose conductors. SCHEDULE E WARRANTY & OUT OF WARRANTY SERVICES AND Miscellaneous 1. REPAIR: Like new condition For products covered under Info-Hold’s three-year limited warranty, Info-Hold will provide NEC with replacement units that are in refurbished, “like new” condition. Units will be replaced on an advanced replacement basis in accordance with section 8b of this document.

Related to Functional defects

  • Environmental Defects If Buyer determines that with respect to the Asset there exists an Environmental Condition (other than with respect to asbestos, asbestos containing materials, or NORM, and excluding any matter set forth on Schedule 6.10) (in each case, an “Environmental Defect”), then on or prior to the Defect Claim Date, Buyer may give Seller a written notice of such Environmental Defect that sets forth the information required by this Section 3.17 (an “Environmental Defect Notice”). For all purposes of this Agreement and notwithstanding anything herein to the contrary, Buyer shall be deemed to have waived any Environmental Defect that Buyer fails to timely and properly assert as an Environmental Defect by an Environmental Defect Notice received by Seller on or before the Defect Claim Date. To be effective, an Environmental Defect Notice must set forth (a) a clear description of the matter constituting the alleged Environmental Defect, (b) a description of each Asset (or portion thereof) affected by the alleged Environmental Defect, (c) the estimated proportionate share attributable to the Assets of the estimated Lowest Cost Response to eliminate the alleged Environmental Defect (the “Environmental Defect Amount”), and (d) supporting documents and reasonably necessary for Seller to verify the existence of the alleged Environmental Defect and the Environmental Defect Amount. Buyer shall furnish Seller, on or before the end of each calendar week prior to the Defect Claim Date, Environmental Defect Notices with respect to any Environmental Defects that any of Buyer’s or any of its Affiliate’s employees, representatives, attorneys, or other environmental personnel or contractors discover or become aware of during the preceding calendar week, which notice may be preliminary in nature and supplemented prior to the Defect Claim Date; provided that notwithstanding this sentence, any Environmental Defect Notice shall be deemed timely if received by Seller prior to the Defect Claim Date.

  • Latent Defects Notwithstanding anything to the contrary set forth herein, no acceptance, or deemed acceptance, by City pursuant to this Section shall be applicable with respect to any Latent Defects. An acceptance, or deemed acceptance, by City pursuant to this Section shall not mean that City has accepted, or the other party has been relieved of, responsibility for: (i) compliance with the Laws; (ii) the proper application of construction means or methods; or (iii) correcting any portion of the Project if it later is determined that any portion of the Project is inconsistent with the Final Documents and Drawings.

  • Correction of Defects 35.1 The Engineer shall give notice to the Contractor of any Defects before the end of the Defects Liability Period, which begins at Completion and is defined in the Contract Data. The Defects Liability Period shall be extended for as long as Defects remain to be corrected. 35.2 Every time notice of a Defect is given, the Contractor shall correct the notified Defect within the length of time specified by the Engineer’s notice.

  • Notice of Defects If, based on Consulting Engineer/Architect's involvement during the construction phase, Consulting Engineer/Architect observes or otherwise becomes aware of any defect in the work, he shall give prompt written notice to City of such defects and their approximate location on the Project. However, Consulting Engineer/Architect shall not have control over or charge of and shall not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions, inspections and programs in connection with the work, since these are solely the contractor's responsibility under the contract for construction. Consulting Engineer/Architect shall not be responsible for the contractor's schedules or failure to carry out the work in accordance with the Contract Documents. Consulting Engineer/Architect shall not have control over or charge of acts or omissions of the contractor, contractor's subcontractors, or their agents or employees.

  • Title Defects 9.1 Purchaser shall have until April 21, 1999 in which to examine the Commitment and the Surveys. If Purchaser finds title to be defective, Purchaser shall, no later than 5:00 p.m. Eastern time on April 21, 1999, notify Seller in writing, specifying the title defect(s). If Purchaser fails to give Seller written notice of any title defect(s) before 5:00 p.m. Eastern time on April 21, 1999, the defects shown in the Commitment or the Surveys shall be deemed to be waived as title objections to closing this transaction. 9.2 If Purchaser has given Seller timely written notice of defect(s) and the defect(s) render the title other than as represented in this Agreement or if any new defects appear from the date of the Commitment through the Closing Date, Seller shall use commercially reasonable efforts to cause only those defects recorded after October 7, 1997 to be cured by the Closing Date. Seller agrees to remove, by payment, bonding or otherwise, any such lien (other than environmental liens) against the Property capable of removal by the payment of money or bonding. Seller shall not be obligated to (but may, in its sole and absolute discretion) cure any other defect or to buyout or settle any other claim or lien against the Property. At Seller's option, the Closing Date may be extended for a period not to exceed sixty (60) days for purposes of eliminating such title defects. If such additional time is reasonably required by Seller to cure such title defects, Seller's failure to extend the Closing Date shall be commercially unreasonable. 9.3 If Seller does not eliminate such defects as of the Closing Date, as the same may be extended under the preceding sentence, or if any new "title defects" appear between the date of the Commitment through the Closing Date which Seller does not eliminate as of the Closing Date, Purchaser shall have the option to: 9.3.1 Close and accept the title "as is," without reduction in the Purchase Price and without claim against Seller for such title defects (except for any lien that Seller is required to cure pursuant to Section 9.2 that can be removed by the payment of money or bonding, for which credit shall be given Purchaser at the Closing unless Seller pays the same at the Closing) (and in such event, the Closing shall take place on the Closing Date); or 9.3.2 Cancel this Agreement, whereupon Escrow Agent, subject to the provisions of Section 11.3, shall return the Deposit, together with all interest earned thereon, to Purchaser, and both parties shall be released from all further obligations under this Agreement, except for those which expressly survive such termination, unless such title defects were caused by Seller's willful act or willful omission, in which event Seller shall remain liable to Purchaser for damages caused by such title defects.