Common use of General Description of Project Clause in Contracts

General Description of Project. [Insert a narrative description of the scope of the project. If there is a separate written document that describes the scope of the project, a cross-reference may be included here so long as it is unambiguous (include document dates, authors, etc.) and the document should be attached.] MILESTONE SCHEDULE [modify as necessary] Project Start: Initial Master Plan Design Committee Meeting: Public Presentations: Special Meetings: Final Approval of Master Plan Design Committee: Review with District Prior to Final Submission: Submission of Final Deliverables: BASIC SERVICES. Section 6 through Section 7 are included in Basic Services if indicated below. Master Planning Facility Assessment – Physical Condition Facility Assessment – Program Other Professional Services Master Planning. Architect shall prepare a Master Plan of the facility, facilities or area identified in Section 2 and/or Section 3 of this Task Order. The Master Plan shall assist the District in determining the best use of the facility, facilities or area relative to physical condition and educational program (provided by District). As directed by District: Architect shall plan and develop facilities and programs for a short and long term look into the future use of facilities which shall include phased approaches to enable the District to apply resources as they become available. Architect shall incorporate district standard educational programs and condition information. Architect shall propose related improvements and/or modifications to adequately support desired programs and physical condition upgrades, refurbishing, or component replacements. Architect shall plan for the possibility to construct new school capacity, infrastructure upgrades, expand or define educational programs, and to develop a master plan to remain in operation during any future construction phases. Architect shall provide graphic plans and images showing enough detail and information sufficient to provide clear direction to potentially proceed with a future design phase as identified in requirements for deliverables. Architect shall provide estimated construction costs and proposed construction timelines. Attend design committee meetings, public presentations, and meetings with municipal authorities, as identified by District.

Appears in 2 contracts

Sources: Architect/Engineer Services Agreement, Architect/Engineer Services Agreement

General Description of Project. [Insert a narrative description of the scope of the project. If there is a separate written document that describes the scope of the project, a cross-reference may be included here so long as it is unambiguous (include document dates, authors, etc.) and the document should be attached.] MILESTONE SCHEDULE [modify as necessary] Project Start: Initial Master Plan Design Committee Meeting: Public Presentations: Special Meetings: Final Approval of Master Plan Design Committee: Review with District Prior to Final Submission: Submission of Final Deliverables: BASIC SERVICES. Section 6 through Section 7 are included in Basic Services if indicated below. Master Planning Facility Assessment – Physical Condition Facility Assessment - Program Other Professional Services Master Planning. Architect shall prepare a Master Plan of the facility, facilities or area identified in Section 2 and/or Section 3 of this Task Order. The Master Plan shall assist the District in determining the best use of the facility, facilities or area relative to physical condition and educational program (provided by District). As directed by District: Architect shall plan and develop facilities and programs for a short and long term look into the future use of facilities which shall include phased approaches to enable the District to apply resources as they become available. Architect shall incorporate district standard educational programs and condition information. Architect shall propose related improvements and/or modifications to adequately support desired programs and physical condition upgrades, refurbishing, or component replacements. Architect shall plan for the possibility to construct new school capacity, infrastructure upgrades, expand or define educational programs, and to develop a master plan to remain in operation during any future construction phases. Architect shall provide graphic plans and images showing enough detail and information sufficient to provide clear direction to potentially proceed with a future design phase as identified in requirements for deliverables. Architect shall provide estimated construction costs and proposed construction timelines. Attend design committee meetings, public presentations, and meetings with municipal authorities, as identified by District.

Appears in 1 contract

Sources: Architect/Engineer Services Agreement