General Design Requirements. General requirements for a successful interconnection with FEUS system are listed below: A. Systems that interconnect by means of an inverter that is UL 1741 compliant meet State and FEUS requirements. B. Interconnected systems must comply with all applicable building and electrical codes. ▇. ▇▇▇▇ requires that a utility-accessible, lockable load-break disconnect switch be installed between the output of the Generating Facility and the point of interconnection. This switch will be called the Generating Facility disconnect switch. This disconnect switch may be operated and controlled by FEUS, must provide a verifiable, visible air gap between the Generating Facility and the point of interconnection. Circuit breakers and inverter software modes do not meet the visible disconnect switch requirement. D. Labeling requirements: 1. Labels shall be weather proof, durable and permanently mounted. 2. Demonstrate compliance with NEC. 3. Include label on Main Service Meter, “Generation System Connected,” or similar. 4. Include label on customer generation disconnect switch, “Customer Generation Disconnect Switch.”
Appears in 3 contracts
Sources: Large Facility Interconnection Agreement, Medium Facility Interconnection Agreement, Large Facility Interconnection Agreement
General Design Requirements. General requirements for a successful interconnection with FEUS system are listed below:
A. Systems that interconnect by means of an inverter that is UL 1741 compliant and meet State and & FEUS requirements.
B. Interconnected systems must comply with all applicable building and electrical codes.
▇. ▇▇▇▇ requires require that a utility-accessible, lockable load-break disconnect switch be installed between the output of the Generating Facility and the point of interconnection. This switch will be called the Generating Facility disconnect switch. This disconnect switch may be operated and controlled by FEUS, must provide a verifiable, visible air gap between the Generating Facility and the point of interconnection. A lugged terminating panel is required as an interconnection point. Direct tap from the line side of the Net Metering point is NOT acceptable (See attached drawing DG-6.1A for reference). Circuit breakers and inverter software modes do not meet the visible disconnect switch requirement.
D. Labeling requirements:
1. Labels shall be weather proof, durable and permanently mounted.
2. Demonstrate compliance with NEC.
3. Include label on Main Service Meter, “Generation System Connected,” or similar.
4. Include label on customer generation disconnect switch, “Customer Generation Disconnect Switch.”