Generating Facility Information Sample Clauses

Generating Facility Information. Generator Type (Check One) Photovoltaic , Wind , Fuel Cell , Hydro , Other Generator Manufacturer: Generator Model Name & Number: Generator Power Rating (KW): Disconnect Switch Manufacturer / Model Number: Disconnect Switch Rating (A): INVERTER DATA (if applicable) Manufacturer: Model: Rated Power Factor (%): Rated Voltage (Volts): Rated Amperes: Inverter Type (ferroresonant, step, pulse-width modulation, etc): Type commutation: forced line Harmonic Distortion: Maximum Single Harmonic (%) Maximum Total Harmonic (%)
Generating Facility Information. You must inform us as soon as possible of any change to your generating facility, metering, or your relationship with the supply address (eg: if you’re moving out). You authorise us to request, and your distributor to provide us, details of your net export generation from periods prior to the commencement of this contract.
Generating Facility Information. Data applies only to the Generating Facility, not the Interconnection Facilities. Prime Mover Information (Refer to U.S. EIA Form 860 Instructions, Table 2 Prime Mover Codes and Descriptions at: ▇▇▇▇▇://▇▇▇.▇▇▇.▇▇▇/survey/form/eia_860/instructions.pdf) Prime Mover Code Prime Mover Description Energy Source Information (Refer to U.S. EIA Form 860 Instructions, Table 28 Energy Source Codes and Heat Content at: ▇▇▇▇▇://▇▇▇.▇▇▇.▇▇▇/survey/form/eia_860/instructions.pdf) Fuel Type Energy Source Code Energy Source Description Type of Generator: Synchronous Induction Inverter Total Generator/ Storage Nameplate Capacity: kWAC (Typical) kVAR Storage Nameplate Energy: kWh Interconnection Customer or Customer-Site Load: kWAC (if none, so state) Interconnection Customer Generator Auxiliary Load: kWAC Typical Reactive Load (if known): kVAR Maximum Generating Capacity Requested: kWAC (The maximum continuous electrical output of the Generating Facility at any time at a power factor of approximately unity as measured at the Point of Interconnection and the maximum kW delivered to the Utility during any metering period) Production profile: provide below the maximum import and export levels (as a percentage of the Maximum Generating Capacity Requested) for each hour of the day, as measured at the Point of Interconnection. Power flow in excess of these levels during the corresponding hour shall be considered an Adverse Operating Effect per section
Generating Facility Information. E. 1.1 Generating Facility is (check one) [ ] New, [ ] Existing
Generating Facility Information. NOTE—Along with the Interconnection and Net Metering Agreement, please include: ▇▇▇ file, Solar Pathfinder report file, site picture with Pathfinder location, spec sheets for system components, and site diagrams before you proceed with your project. Columbia Water & Light reserves the right to deny a net metering agreement or rebate for systems not following utility guidelines. ■ I want to be added to the rebate waiting list I do not want to be on the rebate waiting list Utility Customer Account Number (from utility bill) Name Street Address Zip Code Mailing Address (if different from above) Zip Code Phone Number E-mail Section 2: Photovoltaic Net Metering Facility Information PV Manufacturer/Model Inverter Manufacturer/Model PV Module Location Inverter Nominal Power Rating Manual Disconnect Location Inverter Location Annual Energy (kWh/yr) ▇▇▇▇▇/Module # of Modules Total Capacity (kW) Baseline Rebate Array peak output (kWh) 1 2 3 Array capacity (kW) Array System Tilt Azimuth % of total kW Peak Factor Baseline Rebate × × = × × = × × = Total =
Generating Facility Information. Data applies only to the Generating Facility, not the Interconnection Facilities.
Generating Facility Information. A. Total Generating Facility rated output (MW):
Generating Facility Information. A. 1.1 Location of Generating Facility: ▇▇▇▇ ▇. ▇▇▇▇▇ ▇▇▇▇▇▇ ▇ ▇▇▇▇▇▇▇, ▇▇▇▇▇▇▇ ▇▇▇▇▇
Generating Facility Information. 5 A.1.1 Location of Generating Facility: ▇▇▇▇▇ ▇. ▇▇▇▇▇▇ Road, Arlington, Arizona
Generating Facility Information. {Buyer Comment: attach Excel spreadsheet titled Exhibit B Part 1.} {Buyer Comment: attach Excel spreadsheet titled Exhibit B Part 2.}