Geometric Design and General Features Clause Samples

Geometric Design and General Features. (i) General Geometric design and general features of the Project Highway shall be in accordance with Section 2 of the Manual. (ii) Design speed The design speed shall be the minimum design speed of 100 km per hr for plain/ rolling terrain except given below locations where minimum design speed of 80 km per hr. (iii) Improvement of the existing road geometrics In the following sections, where improvement of the existing road geometrics to the prescribed standards is not possible, the existing road geometrics shall be improved to the extent possible within the given right of way and proper road signs and safety measures shall be provided: (iv) Right of Way Details of the Right of Way are given in ▇▇▇▇▇ ▇▇ of Schedule-A. (v) Type of shoulders In built-up sections, footpaths/fully paved shoulders shall be provided in the following stretches: In open country, paved shoulders of 2.5 m width shall be provided for main highway and balance 1.50m width earthen shoulders shall be covered with 150 mm thick compacted layer of granular material for main highway, slip road, loops and ramps. Design and specifications of paved shoulders and granular material shall conform to the requirements specified in the relevant Manual. (vi) Lateral and vertical clearances at underpasses Lateral and vertical clearances at underpasses and provision of guard rails/crash barriers shall be as per the provision of relevant Manual. Lateral clearance: The width of the opening at the underpasses shall be as follows:
Geometric Design and General Features. (i) General Geometric design and general features of the Project Highway shall be in accordance with Section 2 of the Manual. (ii) Design speed The design speed shall be the minimum design speed of 100 km per hr for plain/ rolling terrain except given below locations where minimum design speed of 80 km per hr. Sl. No. Design Chainage (Km) (Centre Chainage of Curve) Radius of Curvature in m Remarks
Geometric Design and General Features. (i) General (ii) Design speed (iii) Improvement of the existing road geometrics Sl. No. Stretch (from km to km) Type of deficiency Remarks (iv) Right of Way
Geometric Design and General Features. 2.1 General 2.2 Design Speed
Geometric Design and General Features. (i) General Geometric design and general features of the Project Highway shall be in accordance with Section 2 of the Manual. (ii) Design speed The Ruling design speed shall be 80 km/hr for Plain/ Rolling terrain as per Manual. At following locations, speed shall be below 80 km/hr. This Deviation has also been specified in Schedule-D (1) (2) (3) (4) (5) (6) (7) 1 4.115 4.258 200.000m 65 40.9648 (d) Speed & ▇▇▇▇▇▇ 2 7.100 7.269 200.000m 50 48.4000 (d) Speed & ▇▇▇▇▇▇ 3 9.068 9.276 200.000m 35 59.7597 (d) Speed & ▇▇▇▇▇▇ 4 9.566 9.700 200.000m 35 38.5747 (d) Speed & ▇▇▇▇▇▇ 5 9.876 10.137 200.000m 35 74.7792 (d) Speed & ▇▇▇▇▇▇ 6 12.227 12.437 200.000m 65 60.2614 (d) Speed & ▇▇▇▇▇▇ 7 13.530 13.630 200.000m 65 28.6456 (d) Speed & ▇▇▇▇▇▇ 8 16.428 16.468 500.000m 70 4.5399 (d) Speed 9 19.196 19.290 200.000m 50 26.9593 (d) Speed & ▇▇▇▇▇▇ 10 19.426 19.469 200.000m 50 12.2408 (d) Speed & ▇▇▇▇▇▇ 11 19.557 19.610 200.000m 50 14.9166 (d) Speed & ▇▇▇▇▇▇ 12 20.049 20.209 200.000m 35 45.7089 (d) Speed & ▇▇▇▇▇▇ 13 20.255 20.440 200.000m 35 53.2485 (d) Speed & ▇▇▇▇▇▇ (iii) Improvement of the existing road geometrics In the following sections, where improvement of the existing road geometrics to the prescribed standards is not possible, the existing road geometrics shall be improved to the extent possible, within the given right of way; and proper road signs and safety measures shall be provided. This Deviation has also been specified in Schedule-D.
Geometric Design and General Features. (i) General Geometric design and general features of the Project Highway shall be in accordance with Section 2 of the Manual. (ii) Design speed The design speed shall be the minimum design speed of 80 km per hr for plain/ rolling terrain in four lane section. (iii) Improvement of the existing road geometrics In the following sections, where improvement of the existing road geometrics to the prescribed standards is not possible, the existing road geometrics shall be improved to the extent possible within the given right of way and proper road signs and safety measures shall be provided: (iv) Right of Way Details of the Right of Way are given in ▇▇▇▇▇ ▇▇ of Schedule-A. (v) Type of shoulders In built-up sections, footpaths/fully paved shoulders shall be provided in the following stretches: 1 254+621 to 257+300 Yes TCS-3 Design and specifications of paved shoulders and granular material shall conform to the requirements specified in the relevant Manual. (vi) Lateral and vertical clearances at underpasses

Related to Geometric Design and General Features

  • Contract Database Metadata Elements Title: Sayville Union Free School District and Sayville Union Free School Custodial and Maintenance Employees Unit, United Public Service Employees Union (UPSEU), Local 424 (2011) Employer Name: Sayville Union Free School District Union: Sayville Union Free School Custodial and Maintenance Employees Unit, United Public Service Employees Union (UPSEU) Local: 424 Effective Date: 07/01/2011 Expiration Date: 06/30/2015 PERB ID Number: 6131 Unit Size: 55 Number of Pages: 24 For additional research information and assistance, please visit the Research page of the Catherwood website - ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇▇▇▇▇.▇▇▇/library/research/ For additional information on the ILR School - ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇▇▇▇▇.▇▇▇/ 55 People TABLE OF CONTENTS ARTICLE Page XXII ANNUAL LEAVE DAYS 14 XXV BREAKS 18 XXVI CIVIL SERVICE LAW ARTICLE SECTION 75 18 XXVIII DURATION 19 XIV EMERGENCY WORK 11 XXI FOUL WEATHER CLOTHING 14 XI GRIEVANCE PROCEDURE 9 XVI HIGHER JOB CLASSIFICATION 12 XVIII HOLIDAYS 13 XV HOLIDAY AND WEEKEND BUILDING CHECKS 12 V INSURANCE 4 X LAYOFF, DISPLACEMENT AND RECALL ORDER 8 VII MANAGEMENT RIGHTS 7 XXVII MISCELLANEOUS 19 XVII NOTICES OF PROMOTIONS 13 XIII OVERTIME 10 II PAYROLL DEDUCTIONS 1 III PERSONNEL FILES 2 XXIV PHYSICAL EXAMINATIONS 18 XXIII RETIREMENT 16 IX STRIKES AND LOCKOUTS 7 XIX VACATIONS 13 XX VISITATION 14 IV WAGES 3 VI WORKERS' COMPENSATION 6 XII WORKWEEK 10 VIII WRITTEN BOARD POLICY 8 APPENDIX A 20 4/20/2016 AGREEMENT made and entered into this day of November 2013 between the SAYVILLE UNION FREE SCHOOL DISTRICT (hereinafter referred to as the “District”) and United Public Service Employees Union, ▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇▇▇▇▇▇▇▇▇, N.Y. 11779 (hereinafter referred to as the “Union”).

  • Technical Feasibility of String While ICANN has encouraged and will continue to encourage universal acceptance of all top-­‐level domain strings across the Internet, certain top-­‐level domain strings may encounter difficulty in acceptance by ISPs and webhosters and/or validation by web applications. Registry Operator shall be responsible for ensuring to its satisfaction the technical feasibility of the TLD string prior to entering into this Agreement.

  • Specific Provisions for Access Rights to Software For the avoidance of doubt, the general provisions for Access Rights provided for in this Section 9 are applicable also to Software. Parties’ Access Rights to Software do not include any right to receive source code or object code ported to a certain hardware platform or any right to receive respective Software documentation in any particular form or detail, but only as available from the Party granting the Access Rights.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK

  • Maintenance and Support Services If this Agreement is for IT goods or services, this section applies: Unless otherwise specified in this Agreement: The Contractor shall promptly provide the Court with all Upgrades, including without limitation: (i) all Upgrades generally made available by Contractor to its other customers; (ii) Upgrades as necessary so that the Work complies with the Specifications and Applicable Law (including changes in Applicable Law); (iii) Upgrades as necessary so that the Work operates under new versions or releases of the Court’s operating system or database platform; and (iv) all on-site services necessary for installation of Upgrades. Without limiting any other obligation of Contractor under this Agreement, Contractor represents and warrants that it will maintain services, equipment, software or any other part of the Work so that they operate in accordance with their Specifications and Documentation; and The Contractor shall respond to the Court within four (4) hours after the Court reports a Technical Support Incident (such hours all occurring during Standard M&S Hours) to Contractor. DELIVERY, ACCEPTANCE, AND PAYMENT Delivery. Contractor shall deliver to the Court the Deliverables in accordance with this Agreement, including the Statement of Work. Unless otherwise specified by this Agreement, Contractor will deliver all goods purchased by the Court “Free on Board Destination Freight Prepaid” to the Court at the address and location specified by the Court. Title to all goods purchased by the Court vests in the Court upon payment of the applicable purchase price. Contractor will bear the risk of loss for any Work being delivered until received by the Court at the proper location. All shipments by Contractor or its Subcontractors must include packing sheets identifying: this Agreement number, the Court’s purchase order number, item number, quantity and unit of measure, part number and description of the goods shipped, and appropriate evidence of inspection, if required. Goods for different Agreements shall be listed on separate packing sheets.