Grading and Drainage. It is the Owner responsibility to: (a) Not to permit the Land to drain otherwise than into a properly installed drainage system with proper catchbasins connected to a Municipality storm sewers or ditches and the grades and drainage facilities shall be so established as to provide roof water onto the internal system, to implement and maintain an on-site storm water management system to limit storm run-off from the site to a predevelopment rate of flow; (b) To obtain approval from the Ministry of the Environment, the Nottawasaga Valley Conservation Authority and the Municipality with regard to stormwater management facilities; (c) To implement and maintain an on-site storm water management system designed according to the policies and criteria of the Municipality. (d) To implement and monitor on-site sediment and erosion control measures, during construction of this development, to the satisfaction of the Municipality and to allow the Municipality and its agents, in perpetuity, access to the Land to inspect roof drains, inlet control devices and storm water management facilities. (e) To provide regular removal of snow from the site, or to provide sufficient snow storage areas on the Land, and that the parking spaces and landscaping areas will not be used for the stockpiling of snow.
Appears in 2 contracts
Sources: Site Plan Agreement, Site Plan Agreement
Grading and Drainage. It is the Owner responsibility to:
(a) Not to permit the Land Lands to drain otherwise than into a properly installed drainage system with proper catchbasins connected to a Municipality storm sewers or ditches and the grades and drainage facilities shall be so established as to provide roof water onto the internal system, to implement and maintain an on-site storm water management system to limit storm run-off from the site to a predevelopment rate of flow;
(b) To obtain approval from the Ministry of the Environment, the Nottawasaga Valley Conservation Authority and the Municipality with regard to stormwater management facilities;
(c) To implement and maintain an on-site storm water management system designed according to the policies and criteria of the Municipality.
(d) To implement and monitor on-site sediment and erosion control measures, during construction of this development, to the satisfaction of the Municipality and to allow the Municipality and its agents, in perpetuity, access to the Land Lands to inspect roof drains, inlet control devices and storm water management facilities.
(e) To provide regular removal of snow from the site, or to provide sufficient snow storage areas on the LandLands, and that the parking spaces and landscaping areas will not be used for the stockpiling of snow.
Appears in 1 contract
Sources: Site Plan Agreement