Hazardous Waste Exclusion Program. 15 A. Contractor shall develop, maintain, update implement and comply with a hazardous 16 waste exclusion program plan (HWEP), the requirements of which are described in 17 Attachment 7. Should additional measures be required to be incorporated into the 18 HWEP to comply with changes in law or regulations, Contractor shall incorporate, 19 implement and comply with such additional measures. Contractor shall arrange for the 20 safe and lawful temporary storage and disposal of such waste in an appropriate location 21 separate from the U-waste and E-waste materials collected at the Buyback / Drop-off
Appears in 2 contracts
Sources: Operation Agreement, Agreement for Operation of the Shoreway Recycling and Disposal Center
Hazardous Waste Exclusion Program. 15 17 A. Contractor shall develop, maintain, update implement and comply with a hazardous 16 18 waste exclusion program plan (HWEP), the requirements of which are described in 17 19 Attachment 7. Should additional measures be required to be incorporated into the 18 20 HWEP to comply with changes in law or regulations, Contractor shall incorporate, 19 21 implement and comply with such additional measures. Contractor shall arrange for the 20 22 safe and lawful temporary storage and disposal of such waste in an appropriate location 21 23 separate from the U-waste and E-waste materials collected at the Buyback / Drop-offoff 24 center. 25 As a part of the HWEP, the Contractor shall inspect outbound loads of materials that 26 are transported to the Designated Disposal Site or to Designated Processing Facilities.
Appears in 1 contract
Sources: Agreement for Operation of the Shoreway Recycling and Disposal Center