Hose construction Sample Clauses

Hose construction. The hose shall embody a smooth-bore tube and a cover of suitable synthetic material, reinforced with one or more interlayer(s).
Hose construction. 2.2.1. The hose must embody a smooth-bore tube and a cover of suitable synthetic material, reinforced with one or more interlayer(s). 2.2.2. The reinforcing interlayer(s) has (have) to be protected by a cover against corrosion. If for the reinforcing interlayer(s) corrosion-resistant material is used (i.e. stainless steel) a cover is not required. 2.2.3. The lining and the cover must be smooth and free from pores, holes and strange elements. An intentionally provided puncture in the cover shall not be considered as an imperfection.
Hose construction. 2.2.1. The hose shall embody a smooth-bore tube and a cover of suitable synthetic material, reinforced with one or more interlayer(s). 2.2.2. The reinforcing interlayer(s) has (have) to be protected by a cover against corrosion. If for the reinforcing interlayer(s) corrosion-resistant material is used (i.e. stainless steel) a cover is not required.
Hose construction. The synthetic hose shall embody a thermoplastic tube and a cover of suitable thermoplastic material, oil and weatherproof, reinforced with one or more synthetic interlayer(s). If for the reinforcing interlayer(s) a corrosion-resistant material is used (i.e. stainless-steel) a cover is not required.
Hose construction. 3.2.1. The synthetic hose must embody a thermoplastic tube and a cover of suitable thermoplastic material, oil and weatherproof, reinforced with one or more synthetic interlayer(s). E/ECE/324 Rev.1/Add.66/Rev.1 Regulation No. 67 page 73 Annex 8 3.2.2. The lining and the cover must be free from pores, holes and strange elements. An intentionally provided puncture in the cover shall not be considered as an imperfection.
Hose construction. 4.2.1. The synthetic hose shall embody a thermoplastic tube and a cover of suitable thermoplastic material, oil and weatherproof, reinforced with one or more synthetic interlayer(s). If for the reinforcing interlayer(s) a corrosion-resistant material is used (i.e. stainless-steel) a cover is not required. 4.2.2. The lining and the cover shall be free from pores, holes and strange elements. An intentionally provided puncture in the cover shall not be considered as an imperfection.
Hose construction. 1.2.1. The hose must embody a smooth-bore tube and a cover of suitable synthetic material, reinforced with one or more interlayer(s). 1.2.2. The reinforcing interlayer(s) has (have) to be protected by a cover against corrosion. If for the reinforcing interlayer(s) corrosion-resistant-material is used (i.e. stainless-steel) a cover is not required. 1.2.3. The lining and the cover must be smooth and free from pores, holes and strange elements. An intentionally provided puncture in the cover shall not be considered as an imperfection. 1.2.4. The cover has to be intentionally perforated to avoid the forming of bubbles. 1.2.5. When the cover is punctured and the interlayer is made of a non- corrosion-resistant material, the interlayer has to be protected against corrosion. E/ECE/324 Rev.1/Add.66/Rev.1 Regulation No. 67 page 64 Annex 8

Related to Hose construction

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Language Construction The language of this Agreement shall be construed in accordance with its fair meaning and not for or against any party. The parties acknowledge that each party and its counsel have reviewed and had the opportunity to participate in the drafting of this Agreement and, accordingly, that the rule of construction that would resolve ambiguities in favor of non-drafting parties shall not apply to the interpretation of this Agreement.