Common use of Hourly Rates Method Clause in Contracts

Hourly Rates Method. The hourly rates on an individual project shall be determined by using the hourly billable wage rates of the Key Personnel of the Roofing Designer and its Subconsultants that are listed in the Roofing Designer’s Fee Proposal and attached collectively as Exhibit E to this Contract and incorporated by reference into this Contract, and shall not exceed the hourly billable wage rates listed below. Position Hourly Rate Roofing Designer, Principal-in-Charge $ Project Manager/Sr. Roof Consultant $ Licensed Architect $ Project Designer/Roof Consultant $ Cost Estimator $ Construction Administrator $ Quality Control – Roof Inspector $ Clerical $ Position Hourly Rate MEP Engineer, Principal-in-Charge $ Project Manager $ Licensed HVAC Engineer $ Licensed Electrical Engineer $ Licensed Plumbing Engineer $ Project Engineer $ Cost Estimator $ Clerical $ Structural Engineer, Principal in Charge $ Licensed Structural Engineer $ Project Engineer $ Clerical $ These hourly billable wage rates shall be fully loaded, and shall include all labor, benefits, taxes, insurances, fees, overhead costs, administrative costs, reimbursable costs, and profit costs, and shall be firm and fixed priced for the entire duration of this Contract. These hourly billable wage rates shall be all-inclusive wage rates for all personnel listed as Key Personnel on the Roofing Designer’s Key Personnel Team List and all personnel of its Subconsultants listed on the Subconsultants Personnel Lists. Charges for Principals of the Roofing Designer and its Subconsultants shall be for minimal hours only. The Roofing Designer shall be entitled to payment on an individual project for the authorized reimbursable expenses provided in Paragraph 6.8 herein under the hourly rates method.

Appears in 1 contract

Sources: Professional Services

Hourly Rates Method. The hourly rates on an individual project Project shall be determined by using the hourly billable wage rates of the Key Personnel of the Roofing Designer Material Testing Consultant and its Subconsultants that are listed in the Roofing DesignerMaterial Testing Consultant’s Fee Proposal and attached collectively as Exhibit E to this Contract and incorporated by reference into this Contract, and shall not exceed the hourly billable wage rates listed below. Position Hourly Rate Roofing Designer, Principal-in-Principal in Charge $ n/a Senior Project Manager/Sr. Roof Consultant Field Supervisor $ Licensed Architect $ Project Designer/Roof Consultant $ Cost Estimator $ Construction Administrator $ Quality Control – Roof Senior Inspector $ Clerical Inspector/Construction Observer $ Position Hourly Rate MEP Engineer, Principal-in-Charge Environmental Technician $ Project Manager Structural Steel Observer $ Licensed HVAC General Construction Observer $ Geotechnical Engineer $ Licensed Geotechnical Inspector $ Gradiometer Survey $ Technician with Nuclear Density Meter $ Technician with Calibrated Organic Vapor Analyzer $ Radiology/Ultrasonic/Magnetic Inspector $ Survey Team (Radioisotope) $ Electrical Engineer Inspector $ Licensed Plumbing Engineer Air Handling/Balancing Inspector $ Project Engineer $ Cost Estimator $ Clerical $ Structural Engineer, Principal in Charge $ Licensed Structural Engineer $ Project Engineer $ Clerical Weld Inspector $ These hourly billable wage rates shall be fully loaded, and shall include all labor, benefits, taxes, insurances, fees, overhead costs, administrative costs, reimbursable costs, and profit costs, and shall be firm and fixed priced for the entire duration of this Contract. These hourly billable wage rates shall be all-inclusive wage rates for all personnel listed as Key Personnel on the Roofing DesignerMaterial Testing Consultant’s Key Personnel Team List and all personnel of its Subconsultants listed on the Subconsultants Personnel Lists. Charges for Principals of the Roofing Designer and its Subconsultants shall be for minimal hours only. The Roofing Designer Material Testing Consultant shall be entitled to payment on an individual project Project for the authorized reimbursable expenses Reimbursable Expenses provided in Paragraph 6.8 herein under the hourly rates method. (1) The Material Testing Consultant’s Compensation under the Hourly Rates Method will be equal to (1) the hourly rate, as provided in Exhibit E, for each Task listed in the Task Order multiplied by the approved time amount as listed in the approved Schedule for each Task listed in the Task Order, plus (2) the cost for the specific task, as provided in Exhibit

Appears in 1 contract

Sources: Contract for Supplemental Professional Material Testing and Inspection Services

Hourly Rates Method. The hourly rates on an individual project shall be determined by using the hourly billable wage rates of the Key Personnel of the Roofing Designer MEP & FP Engineer and its Subconsultants that are listed in the Roofing DesignerMEP & FP Engineer’s Fee Proposal and attached collectively as Exhibit E to this Contract and incorporated by reference into this Contract, and shall not exceed the hourly billable wage rates listed below. Position Hourly Rate Roofing DesignerMEP & FP Engineer, Principal-in-Charge $ Project Manager/Sr. Roof Civil Consultant $ Licensed Architect PE – Mechanical/Plumbing Engineer $ Project Designer/Roof Consultant Licensed PE – Electrical Engineer $ Quality Control $ Construction Administrator $ Cost Estimator $ Construction Administrator Clerical $ Quality Control – Roof Inspector $ Clerical CADD Operator $ Position Hourly Rate MEP EngineerArchitectural, Principal-in-Charge $ Project Manager $ Licensed HVAC Engineer $ Licensed Electrical Engineer $ Licensed Plumbing Engineer $ Project Engineer $ Cost Estimator RA Architect CADD Operator $ Clerical $ Civil/Structural Engineer, Principal in Charge $ Licensed PE Civil/Structural Engineer $ Project Engineer CADD Operator $ Clerical $ Estimator $ Project Manager $ Elevator Technician $ These hourly billable wage rates shall be fully loaded, and shall include all labor, benefits, taxes, insurances, fees, overhead costs, administrative costs, reimbursable costs, and profit costs, and shall be firm and fixed priced for the entire duration of this Contract. These hourly billable wage rates shall be all-inclusive wage rates for all personnel listed as Key Personnel on the Roofing DesignerMEP & FP Engineer’s Key Personnel Team List and all personnel of its Subconsultants listed on the Subconsultants Personnel Lists. Charges for Principals of the Roofing Designer MEP & FP Engineer and its Subconsultants shall be for minimal hours only. The Roofing Designer MEP & FP Engineer shall be entitled to payment on an individual project for the authorized reimbursable expenses provided in Paragraph 6.8 herein under the hourly rates method.

Appears in 1 contract

Sources: Professional Services