Implementing Documents. 140 These plans take into account the Tender Specifications and technical provisions, the design drawings of the project developer and general architecture plans, stability plans, and special techniques plans annexed to these Tender Specifications. §141 All implementation plans and detail plans are to be submitted for approval to the contracting authority along with calculation notes, technical approvals, and technical forms and in particular those related to the works and the equipment listed below (non- exhaustive list): 1° Upgrade foundations in view of works planned 2° Stability: plans for slabs, posts and beams, stairs, or any prefabricated component 3° Sealing 4° Finishing of rooms (walls, floor, and ceiling) 5° Inside and outside drainage 6° List of stones 7° Roof covering, roof carpentry 8° Façades 9° Partition walls 10° False ceilings 11° Furniture based on tender documents 12° Lights layout plan 13° Plan of metal joinery (banisters, handrails, gangway, porch) 14° List of inside joinery Plan of special techniques §142 The managing official may refuse technical forms which are partial, incomplete, or too commercial and do not provide the technical information required for assessment and approval. §143 Samples of ironware, heating, electricity or plumbing fixtures or any similar pieces will be submitted for approval to the managing official and for advice to the project developer's and the approved model will remain on the construction site until the placement of the last piece of its kind. §144 At the request of the contracting authority, the building contractor will also provide the following documents during the performance period: 1° Samples of materials proposed corresponding to the technical forms. 2° Colour shade cards to determine the choice of colours 3° Test reports, technical manuals, technical approvals, technical forms, etc. 4° Products or equipment used for this contract.
Appears in 1 contract
Sources: Public Works Contract
Implementing Documents. 140 These plans take into account the Tender Specifications and technical provisions, the design drawings of the project developer and general architecture plans, stability plans, and special techniques plans annexed to these Tender Specifications. §141 All implementation plans and detail plans are to be submitted for approval to the contracting authority along with calculation notes, technical approvals, and technical forms and in particular those related to the works and the equipment listed below (non- non-exhaustive list):
1° Upgrade foundations in view of works planned 2° Stability: plans for slabs, posts and beams, stairs, or any prefabricated component 3° Sealing 4° Finishing of rooms (walls, floor, and ceiling) 5° Inside and outside drainage 6° List of stones 7° Roof covering, roof carpentry 8° Façades 9° Partition walls 10° False ceilings 11° Furniture based on tender documents 12° Lights layout plan 13° Plan of metal joinery (banisters, handrails, gangway, porch) 14° List of inside joinery Plan of special techniques §142 The managing official may refuse technical forms which are partial, incomplete, or too commercial and do not provide the technical information required for assessment and approval. §143 Samples of ironware, heating, electricity or plumbing fixtures or any similar pieces will be submitted for approval to the managing official and for advice to the project developer's and the approved model will remain on the construction site until the placement of the last piece of its kind. §144 At the request of the contracting authority, the building contractor will also provide the following documents during the performance period: 1° Samples of materials proposed corresponding to the technical forms.
forms (see “Samples” in Annex 3 - Technical Specifications) 2° Colour shade cards to determine the choice of colours 3° Test reports, technical manuals, technical approvals, technical forms, etc. 4° Products or equipment used for this contract.(see
Appears in 1 contract
Sources: Public Works Contract
Implementing Documents. 140 These plans take into account the Tender Specifications and technical provisions, the design drawings of the project developer and general architecture plans, stability plans, and special techniques plans annexed to these Tender Specifications. §141 All implementation plans and detail plans are to be submitted for approval to the contracting authority along with calculation notes, technical approvals, and technical forms and in particular those related to the works and the equipment listed below (non- non-exhaustive list):
1° Upgrade foundations in view of works planned 2° Stability: plans for slabs, posts and beams, stairs, or any prefabricated component 3° Sealing 4° Finishing of rooms (walls, floor, and ceiling) 5° Inside and outside drainage 6° List of stones 7° Roof covering, roof carpentry 8° Façades 9° Partition walls 10° False ceilings 11° Furniture based on tender documents 12° Lights layout plan 13° Plan of metal joinery (banisters, handrails, gangway, porch) 14° List of inside joinery Plan of special techniques §142 The managing official may refuse technical forms which are partial, incomplete, or too commercial and do not provide the technical information required for assessment and approval. §143 Samples of ironware, heating, electricity or plumbing fixtures or any similar pieces will be submitted for approval to the managing official and for advice to the project developer's and the approved model will remain on the construction site until the placement of the last piece of its kind. §144 At the request of the contracting authority, the building contractor will also provide the following documents during the performance period: 1° Samples of materials proposed corresponding to the technical forms.
2° Colour shade cards to determine the choice of colours 3° Test reports, technical manuals, technical approvals, technical forms, etc. 4° Products or equipment used for this contract.:
Appears in 1 contract
Sources: Public Works Contract