Incident Summary Clause Samples

The Incident Summary clause serves to provide a concise overview of any incidents relevant to the agreement or subject matter. Typically, this clause outlines the key facts, dates, parties involved, and the nature of the incident, ensuring that all stakeholders have a clear and consistent understanding of what occurred. By summarizing incidents in a standardized format, this clause helps prevent misunderstandings and supports efficient communication and resolution of issues.
POPULAR SAMPLE Copied 1 times
Incident Summary. This reporting period Reporting period- 1 year ago Reporting period- 2 years ago
Incident Summary. On April 5, 2001, natural gas and natural gas condensate were discharged near the northern bank of Mosquito Bay, Terrebonne Parish, Louisiana (Figure 1. 1). The discharge originated from a 20-inch pipeline that transported natural gas condensate produced from several gas ▇▇▇▇▇, which resulted in a large volume of natural gas condensate flowing through the line. Williams, LOSCO, LDEQ, and the U.S. Coast Guard (USCG) provided estimates of discharge volume that ranged from 1,000 to 3,000 barrels. Brackish ▇▇▇▇▇ vegetation (hereafter referred to as “▇▇▇▇▇”), ▇▇▇▇▇ sediments, coastal waters, and fauna inhabiting this area were exposed to natural gas condensate from this discharge. A controlled burn was used during the incident response on April 12 and 13, 2001, to remove natural gas condensate from the environment. The burn affected ▇▇▇▇▇ that was not exposed to natural gas condensate because the fire moved outside of the planned burn area. Additional injury to ▇▇▇▇▇ was caused by heavy equipment used to repair the pipeline. The Trustees and the RP’s consultant conducted several field investigations after the burn to assess ▇▇▇▇▇ recovery. Based on these field investigations, the Trustees delineated the spatial extent of exposure from the discharged material and the severity of effect to natural resources and services. The Trustees concluded that birds, fish, and other fauna, as well as their habitat, were exposed to natural gas condensate. Thus, the Trustees initiated a natural resource damage assessment (NRDA) to determine the nature and extent of injuries to natural resources and services. The RP has been a cooperative participant throughout the NRDA process.
Incident Summary. This reporting period Reporting year ago Reporting period- 2 years ago Report TOTAL each parameter
Incident Summary o Type of Infringement: Unauthorized sale, counterfeit product, unauthorized reproduction of designs, or manipulation of product details. o Date of Detection: [DD/MM/YYYY]. o Time of Detection: [HH:MM].

Related to Incident Summary

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peach, cotton, pistachio, potato, table tomatoes, industrial tomatoes, grapes, kiwi, walnut) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

  • Executive Summary Contractor shall, upon request by NASPO ValuePoint, provide NASPO ValuePoint with an executive summary that includes but is not limited to a list of states with an active Participating Addendum, states with which Contractor is in negotiations, and any Participating Addendum roll-out or implementation activities and issues. NASPO ValuePoint and Contractor will determine the format and content of the executive summary.

  • JOB SUMMARY Vouches sample transaction in audit verification assignments and submits findings to supervisor; • Records proceedings of entry and exit conferences; • Collects and analyses data and statistics; • Prepares audit working papers for review by supervisor; • Undertakes any other duties that may be assigned by the Chief Internal Audit Technician.

  • Service Description 2.1 General

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass ▇▇▇▇▇▇. In addition to runoff conveyance, the grass ▇▇▇▇▇▇ also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off- site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12- inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1-2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after Waukesha County accepts verification of construction from the project engineer.