Increased Cost of Construction Sample Clauses

Increased Cost of Construction. Building codes change. If a structure was erected prior to the change, the building usually is “grandfathered” as to complying with the changes. However, if loss or damage to the building occurs the local government can mandate that the building be constructed or repaired to meet current building codes. This typically is not anticipated in developing the replacement cost of the building; therefore adequate limits will not provide protection for this situation. Coverage under this endorsement covers this gap in protection.
Increased Cost of Construction. In the event of physical damage to “Covered Property” insured by a “Covered Peril,” this “Memorandum” is extended to cover the increased cost of repair or replacement occasioned by the enforcement of any local or state ordinance or law in any state regulating the construction, repair or demolition of buildings or structures, which is in force at the time such a loss occurs or which comes into force within six (6) months after such a loss occurs, which necessitates in repairing or replacing the building covered hereunder which has suffered damage or destruction by the “Covered Peril” or which has undergone demolition, limited, however, to the minimum requirements of such ordinance or law.
Increased Cost of Construction. 1) This Agreement covers the reasonable and necessary costs incurred, described in Item 3) below, to satisfy the minimum requirements of the enforcement of any law or ordinance regulating the demolition, construction, repair, replacement or use of buildings or structures at a Covered Property, provided: a. Such law or ordinance is in force on the date of covered physical loss or damage; and b. Its enforcement is a direct result of such covered physical loss or damage; and 2) This Additional Coverage does not cover any loss due to any law or ordinance with which the Named Member should have complied before the loss. 3) This Additional Coverage, as respects the property covered in Item 1) above, covers: a. The cost to repair or rebuild the physically damaged portion of such property with materials and in a manner to satisfy such law or ordinance; and b. The cost: (i) to demolish the physically undamaged portion of such property covered; and (ii) to rebuild it with materials and in a manner to satisfy such law or ordinance; to the extent that such costs result when the total demolition of the physically damaged covered property is required to satisfy such law or ordinance. SECTION I PROPERTY (continued) 4) This Additional Coverage excludes any costs incurred as a direct or indirect result of enforcement of any laws or ordinances regulating any form of contamination including but not limited to the presence of Pollution or hazardous material. 5) ▇▇▇▇’s maximum liability for this Additional Coverage at each Covered Property in any occurrence will not exceed the actual cost incurred in demolishing the physically undamaged portion of the property covered in Item 1) above plus the lesser of: a. The reasonable and necessary cost incurred, excluding the cost of land, in rebuilding on another site; or b. The cost of rebuilding on the same site.
Increased Cost of Construction. This section covers the reasonable and necessary costs incurred, described below, to satisfy the minimum requirements of the enforcement of any law or ordinance regulating the demolition, construction, repair, replacement or use of buildings or structures, provided: a. Such law or ordinance is in force on the date of insured physical loss or damage; and b. Its enforcement is a direct result of such insured physical loss or damage; and c. This additional coverage does not cover any loss due to any law or ordinance with which you should have complied before the loss. d. The cost to repair or rebuild the physically damaged portion of such property with materials and in a manner to satisfy such law or ordinance; and e. The cost: (1) to demolish the physically undamaged portion of such property insured; and (2) to rebuild it with materials and in a manner to satisfy such law or ordinance to the extent that such costs result when the total demolition of the physically damaged insured property is required to satisfy such law or ordinance. f. This additional coverage excludes any costs incurred as a direct or indirect result of enforcement of any laws or ordinances regulating any form of contamination including but not limited to the presence of a pollutant or hazardous material. g. The maximum liability for this additional coverage at each covered property in any occurrence will not exceed the actual cost incurred in demolishing the physically undamaged portion of the property insured plus the lesser of: (1) The reasonable and necessary cost incurred, excluding the cost of land, in rebuilding on another site; or (2) The cost of rebuilding on the same site.

Related to Increased Cost of Construction

  • Cost of Construction 1. During the Schematic Design, Design Development, and Construction Document Phases, the ARCHITECT’s estimates of Construction Cost shall be reconciled against the Budget approved by the DISTRICT pursuant to Article IV, Section 2. 2. The PROJECT’s “Construction Cost,” as used in this AGREEMENT, means the total cost to the DISTRICT of all work designed or specified by the ARCHITECT, which includes the total award from the initial construction Contract(s) plus the work covered by approved change orders and/or any alternates approved by the DISTRICT. The Construction Cost shall not include any costs that are not specifically referenced in this Article V, Section 2, as approved costs. Costs excluded from the Construction Cost include, but are not limited to, payments to the ARCHITECT or other DISTRICT consultants, costs of inspections, surveys, tests, and landscaping not included in PROJECT. 3. If the PROJECT is using the multiple-prime delivery method of construction, the Construction Manager’s fees and/or general conditions will only be included in the total Construction Cost used to calculate the ARCHITECT’s fee only if agreed upon in writing by the DISTRICT. Absent any written agreement, the Construction Manager’s fees or general conditions shall not be included in the total Construction Cost used to calculate the ARCHITECT’s fee. 4. When labor or material is furnished by the DISTRICT below its market cost, the Construction Cost shall be based upon current market cost of labor and new material. 5. The Construction Cost shall be the acceptable estimate of Construction Costs to the DISTRICT as submitted by the ARCHITECT until such time as bids have been received, whereupon it shall be the bid amount of the lowest responsible responsive bidder. 6. Any Budget or fixed limit of Construction Cost shall be adjusted if the bidding has not commenced within ninety (90) days after the ARCHITECT submits the Construction Documents to the DISTRICT to reflect changes in the general level of prices in the construction industry between the date of submission of the Construction Documents to the DISTRICT and the date on which bids are sought for the PROJECT. 7. If the lowest bid received exceeds the Budget: a. The DISTRICT may give written approval of an increase of such fixed limit and proceed with the construction of the PROJECT; b. The DISTRICT may authorize rebidding of the PROJECT within a reasonable time; c. If the PROJECT is abandoned, the DISTRICT may terminate this AGREEMENT in accordance with Article VIII, Section 2; d. The DISTRICT may request the ARCHITECT prepare, at no additional cost, deductive change packages that will bring the PROJECT within the Budget; or e. The DISTRICT may request the ARCHITECT cooperate in revising the PROJECT scope and quality as required to reduce the Construction Cost. 8. If the DISTRICT chooses to proceed under Article V, Section 7(e), the ARCHITECT, without additional charge, agrees to redesign the PROJECT until the PROJECT is brought within the Budget set forth in this AGREEMENT. Redesign does not mean phasing or removal of parts of the PROJECT unless agreed to in writing by the DISTRICT. Redesign means the redesign of the PROJECT, with all its component parts, to meet the Budget set forth in this AGREEMENT.

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Commencement of Construction Construction of the Project will start within thirty (30) days after notification to the Developer by the Owner, or as soon thereafter as weather and ground conditions permit.