Common use of Information and other things Clause in Contracts

Information and other things. Inspection Interim Report provided to the Employer before filling of the reactor primary system for reload. This summary report contains: • the final scope of inspections; • the reports and follow up of the activities duly completed; • the results of the inspections; • the characteristics of possible indications (dimensions, position, orientation, and drawings) and comparison with previous results; • if possible, the data in order to confirm the origin and the type of the possible defects (construction, corrosion, etc.); The Contractor provides a final inspection report to the Employer at Completion but not later than 14 days after Completion of the for outages and on, line inspections This final report contains: • the final scope of inspections; • the description of the inspection conditions • the description of the possible deviations to the Contractor’s internal procedures and the • the complete results of the inspections; • the detailed description of the possible indications including their interpretation with regard to the Code and KNPS’s requirements, comparison with the previous results and drawings that clearly show the positions and orientations of all data (requested by the Employer) related to the results of the inspection or necessary to obtain approval from the Authorities. The current schedule of tasks and activities is provided in Table 1.

Appears in 1 contract

Sources: Nec3 Term Service Contract (Tsc3)

Information and other things. Inspection Interim Report provided to the Employer before filling of the reactor primary system for reload. This summary report contains: • the final scope of inspections; • the reports and follow up of the activities duly completed; • the results of the inspections; • the characteristics of possible indications (dimensions, position, orientation, and drawings) and comparison with previous results; • if possible, the data in order to confirm the origin and the type of the possible defects (construction, corrosion, etc.); The Contractor provides a final inspection report to the Employer at Completion but not later than 14 days after Completion of the for outages and on, line inspections This final report contains: • the final scope of inspections; • the description of the inspection conditions • the description of the possible deviations to the Contractor’s internal procedures and the • the complete results of the inspections; • the detailed description of the possible indications including their interpretation with regard to the Code and KNPS’s requirements, comparison with the previous results and drawings that clearly show the positions and orientations of all data (requested by the Employer) related to the results of the inspection or necessary to obtain approval from the Authorities. The current schedule of tasks and activities is provided in Table 1.below. Notes:

Appears in 1 contract

Sources: Nec3 Term Service Contract (Tsc3)