Installation of Utilities. If Verizon is unable to install its own electrical service and meter, it may connect the WIRELESS NETWORK, or its equipment, to an existing source of electrical power on the Premises, if available, as determined by Seattle Center. In that event, Verizon, at its sole cost, will install a submeter to measure its actual electrical usage. Verizon will provide Seattle Center with meter readings and invoices on an annual basis, no later than January 10 of the year following the readings. Verizon will pay Seattle Center annually for the electric usage based on the rate in effect at the time of actual electrical usage and submeter readings, and such payments will be made within thirty