Common use of Installation Work Clause in Contracts

Installation Work. a) SPD will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RfS No. dated of SECI. SPD shall provide to the Buying Entity a bill of materials listing the major equipment constituting the System. Such bill of materials shall be provided within thirty (30) days of the Commercial Operation Date. b) SPD shall have access as reasonably permitted by the Buying Entity to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the SPD shall commission the System with a capacity of approximately kWp. d) SPD shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Buying Entity. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, SPD shall not do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; (c) carryout any other modification of the Premises without the written consent of the Buying Entity. SPD shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment/ facilities owned by the Buying Entity due to the SPD, the same shall be made good/rectified by the SPD at their cost. f) SPD shall, within thirty (30) days of the Effective Date, submit to the Buying Entity shop drawings of the Project for approval ("Shop Drawings"). If the Buying Entity has any objection/recommendation in the Shop Drawings, it shall communicate the same to SPD within a period of thirty (30) working days of the date of submission of theShop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. g) Subject to any punch-list items which shall be agreed by the SPD as not being material to completion of the Project, the SPD agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date (“Scheduled Completion Date”). Buying Entity shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System. h) If the SPD is unable to commence supply of Solar Power to the Buying Entity by the Scheduled Completion Date, other than for the reasons specified in Article 11 and

Appears in 6 contracts

Sources: Power Purchase Agreement (Ppa), Power Purchase Agreement (Ppa), Power Purchase Agreement (Ppa)

Installation Work. a) SPD The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RfS RFS No. dated of SECI. SPD shall provide to the Buying Entity a bill of materials listing the major equipment constituting the System. Such bill of materials shall be provided within thirty (30) days of the Commercial Operation Date. b) SPD The Power Producer shall have access as reasonably permitted by the Buying Entity Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the SPD Power Producer shall commission the System with a capacity of approximately kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing. d) SPD The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Buying EntityPurchaser. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, SPD the Power Producer shall not do do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; disturbed ;(c) carryout Carry out any other modification of the Premises without the written consent of the Buying Entity. SPD Purchaser. f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment/ equipment / facilities owned by the Buying Entity Purchaser due to the SPDPower Producer, the same shall be made good/good rectified by the SPD Power Producer at their cost. fg) SPD The Power Producer shall, within thirty fifteen (3015) working days of the Effective Date, submit to the Buying Entity Purchaser shop drawings of the Project for approval ("Shop Drawings"). The drawings will have to be approved from the Power Purchaser within 3 working days from the submission of the drawings. If the Buying Entity Purchaser has any objection/recommendation objection/'recommendation in the Shop Drawings, it he shall communicate the same to SPD Power Producer within a period of thirty ten (3010) working days of the date of submission of theShop the Shop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. g) . Subject to any punch-list items which shall be agreed by the SPD the. Purchaser as not being material to completion of the Project, the SPD Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Buying Entity Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System. h) If the SPD Power Producer is unable to commence supply of Solar Power to the Buying Entity Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 andand 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF EXPERT PSU> genuine pre-estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the <NAME OF EXPERT PSU> RFS appended as Schedule VI format as per respective RFS document to this Agreement. i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement. j) Power Producer shall fulfill all obligations undertaken by it under this Agreement.

Appears in 2 contracts

Sources: Power Purchase Agreement (Ppa), Memorandum of Understanding, Power Purchase Agreement, Engineering Procurement & Construction Agreement

Installation Work. (a) SPD will cause Subject to the Project to be designedterms and conditions of this Letter Agreement, manufacturedProducer shall construct and install the On-Pad Facilities at the Pad Location at its sole cost and expense. The On-Pad Facilities shall include ultrasonic measurement equipment, supplied, engineered, erected, tested and commissioned, operated & maintained Producer shall construct and constructed substantially install the On-Pad Facilities in accordance with RfS Nothe construction and design specifications provided by Gatherer (“Installation Work”), provided, that in any event Producer the performance standard set forth in Section 3.1 of the Gathering Agreement shall apply to Producer’s performance of the Installation Work, mutatis mutandis. dated of SECI. SPD Producer agrees that the Pad Location shall provide reasonably sufficient space for the On-Pad Facilities, be level, stabilized and in a condition that will allow reasonably free access and movement to and from the Buying Entity a bill of materials listing Pad Location and otherwise in compliance with the major equipment constituting the System. Such bill of materials shall be provided within thirty specifications set forth on Exhibit A. (30) days of the Commercial Operation Date. b) SPD shall have access as reasonably permitted by the Buying Entity Producer agrees to perform use commercially reasonable efforts to complete the Installation Work on or before the later of [***] or the date that is [***] weeks after the date of this Letter Agreement; provided, however, Gatherer shall have the right promptly thereafter to inspect the Installation Work and approve the On-Pad Facilities and the Pad Location prior to placing the On-Pad Facilities into service. (c) Producer shall own, maintain, repair and replace the On-Pad Facilities, the JT Farms Well Line and all other facilities which are downstream of the On-Pad Facilities and upstream of the interconnection at the Premises Off-Pad Location (collectively, the “Downstream Facilities”) at its sole cost and expense, it being understood that, notwithstanding anything in a manner that minimizes inconvenience the Gathering Agreement to the contrary, the Downstream Facilities and interference with the use On-Pad Facilities shall be deemed to be Producer facilities subject to Sections 3.3(g) and 8.4 of the Premises Gathering Agreement and all Measurement Facilities at the On-Pad Location shall be Producer Measurement Facilities (and Exhibit M to the Gathering Agreement shall be deemed amended hereby to include the JT Farms Well Pad). Notwithstanding the foregoing, Gatherer shall be entitled to operational control over the Downstream Facilities and On-Pad Interconnect Facilities to the extent commercially practicalnecessary to comply with its obligations under the Gathering Agreement, including any responsibilities for Customer (Producer) Owned Measurement Facilities as set forth on Exhibit N to the Gathering Agreement. c(d) It is agreed between Producer hereby agrees to grant and convey to Gatherer an easement and right of way including, without limitation, the Parties right of ingress and egress to and from the JT Farms Well Pad, the On-Pad Location and the Downstream Facilities, along the route depicted on Exhibit A, for the purpose of performing its obligations under the Gathering Agreement, subject to the terms and conditions hereof; provided, however, that the SPD terms of Sections 3.11(b) and 3.11(c) of the Gathering Agreement shall commission the System with a capacity of approximately kWpapply to such grant and conveyance, mutatis mutandis. d(e) SPD shall provide The Parties agree to cooperate in good faith with each other Party in seeking necessary environmental permits and lay the dedicated electrical cables for transmission of Solar Power authorizations from the System up to applicable Governmental Authorities permitting the Delivery Point. Transmission or distribution JT Farms Well Pad and On-Pad Facilities and setting forth the limit of Solar Power beyond this point will be the responsibility of the Buying Entity. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Partiesdisturbance and other specifications and limitations, SPD shall not do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; (c) carryout any other modification of the Premises without the written consent of the Buying Entity. SPD shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment/ facilities owned by the Buying Entity due to the SPD, the same shall be made good/rectified by the SPD at their cost. f) SPD shall, within thirty (30) days of the Effective Date, submit to the Buying Entity shop drawings of the Project as needed for approval ("Shop Drawings"). If the Buying Entity has any objection/recommendation in the Shop Drawings, it shall communicate the same to SPD within a period of thirty (30) working days of the date of submission of theShop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. g) Subject to any punch-list items which shall be agreed by the SPD as not being material to completion of the Project, the SPD agrees that it shall achieve the completion of the Project/ Commissioning Installation Work, Future Work and Decommission Work, as applicable. To that end, Producer agrees that prior to submitting all applications or other permitting materials to the applicable Governmental Authorities, it will provide such application, plans, maps, specifications and other related information to Gatherer that Gatherer reasonably requests for Gatherer’s review, and the Parties shall coordinate the pad design and specifications, including the limit of disturbance and other specifications for the On-Pad Facilities at the Pad Location, consistent with the terms and conditions hereof and Sections 3.12 and 3.13 of the Project within Gathering Agreement. (f) In the scheduled completion period from event that Producer should drill additional ▇▇▇▇▇ on the Effective Date JT Farms Well Pad in the future, Producer shall be responsible for the construction and/or installation, at its sole cost and expense, of all additional Receipt Point facilities and ancillary facilities which are necessary to accommodate production therefrom, including, without limitation, any well lines and Measurement Facilities, whether located on the JT Farms Well Pad or at an off-pad location (“Scheduled Completion DateFuture Work”). Buying Entity shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System. h(g) If the SPD is unable to commence supply of Solar Power Except to the Buying Entity by extent expressly set forth herein, this Letter Agreement shall not amend or otherwise modify the Scheduled Completion Date, obligations of the Parties with respect to the connection of any future ▇▇▇▇▇ on the JT Farms Well Pad or otherwise to the Gathering System under Section 3.3 of the Gathering Agreement and the other than for the reasons specified in Article 11 andterms and conditions thereof.

Appears in 2 contracts

Sources: Gas Gathering and Compression Agreement (EQT Corp), Gas Gathering and Compression Agreement (Equitrans Midstream Corp)

Installation Work. a) SPD The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RfS NoRFS No dated: and the sanction letter issued by <NAME OF EXPERT PSU>. dated of SECI. SPD The Power Producer shall provide to the Buying Entity Purchaser a bill ▇▇▇▇ of materials listing the major equipment constituting the System. Such bill ▇▇▇▇ of materials shall be provided within thirty (30) 30 days of the Commercial Operation Date. b) SPD The Power Producer shall have access as reasonably permitted by the Buying Entity Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the SPD Power Producer shall commission the System with a capacity of approximately kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing. d) SPD The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Buying EntityPurchaser. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, SPD the Power Producer shall not do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; disturbed ;(c) carryout Carry out any other modification of the Premises without the written consent of the Buying Entity. SPD Purchaser. f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment/ equipment / facilities owned by the Buying Entity Purchaser due to the SPDPower Producer, the same shall be made good/good rectified by the SPD Power Producer at their cost. fg) SPD The Power Producer shall, within thirty fifteen (3015) working days of the Effective Date, submit to the Buying Entity Purchaser shop drawings of the Project for approval ("Shop Drawings"). The drawings will have to be approved from the Power Purchaser within 3 working days from the submission of the drawings. If the Buying Entity Purchaser has any objection/recommendation objection/'recommendation in the Shop Drawings, it he shall communicate the same to SPD Power Producer within a period of thirty ten (3010) working days of the date of submission of theShop the Shop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. g) . Subject to any punch-list items which shall be agreed by the SPD the. Purchaser as not being material to completion of the Project, the SPD Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Buying Entity Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System. h) If the SPD Power Producer is unable to commence supply of Solar Power to the Buying Entity Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 andand 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF EXPERT PSU> genuine pre-estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the <NAME OF EXPERT PSU> RFS appended as Schedule VI format as per respective RFS document to this Agreement. i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement. j) Power Producer shall fulfill all obligations undertaken by it under this Agreement.

Appears in 1 contract

Sources: Power Purchase Agreement

Installation Work. a) SPD The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RfS NoRFP No dated: and the sanction letter issued by Cochin Port Trust. dated of SECI. SPD The Power Producer shall provide to the Buying Entity Purchaser a bill of materials listing the major equipment constituting the System. Such bill of materials shall be provided within thirty (30) 30 days of the Commercial Operation Date. b) SPD . The Power Producer shall have access as reasonably permitted by the Buying Entity Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) . It is agreed between the Parties that the SPD Power Producer shall commission the System with a capacity of approximately kWp. d) SPD . Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing. The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Buying EntityPurchaser. The Delivery Point shall be where the Main Metering System is located. e) . Unless otherwise agreed between the Parties, SPD the Power Producer shall not do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; disturbed ;(c) carryout Carry out any other modification of the Premises without the written consent of the Buying EntityPurchaser. SPD The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is are caused to the equipment/ equipment / facilities owned by the Buying Entity due to Purchaser arising from any act or omission of the SPDPower Producer, the same shall be made good/good rectified by the SPD Power Producer at their cost. f) SPD . The Power Producer shall, within thirty fifteen (3015) working days of the Effective Date, submit to the Buying Entity Purchaser shop drawings of the Project for approval ("Shop Drawings"). The drawings will have to be approved by the Power Purchaser within 3 working days from the date of submission of the drawings. If the Buying Entity Purchaser has any objection/objection/ recommendation in the Shop Drawings, it he shall communicate the same to SPD Power Producer within a period of thirty five (305) working days of the date of submission of theShop the Shop Drawings. Any delay will extend the Effective effective Date and such approval shall not be unreasonably withheld. g) . Subject to any punch-list items which shall be agreed by the SPD the. Purchaser as not being material to completion of the Project, the SPD Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Buying Entity Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System. h) . If the SPD Power Producer is unable to commence supply of Solar Power to the Buying Entity Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article Section 11 andand 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to Cochin Port Trust genuine pre-estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the Cochin Port Trust RFP appended as Schedule 6: RFP format as per respective RFP document to this Agreement. The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement. Power Producer shall fulfil all obligations undertaken by it under this Agreement.

Appears in 1 contract

Sources: Power Purchase Agreement (Ppa)

Installation Work. a) SPD will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RfS No. dated of SECI. SPD shall provide to the Buying Entity a bill of materials listing the major equipment constituting the System. Such bill of materials shall be provided within thirty (30) days of the Commercial Operation Date. b) SPD shall have access as reasonably permitted by the Buying Entity to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the SPD shall commission the System with a capacity of approximately kWp. d) SPD shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Buying Entity. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, SPD shall not do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; (c) carryout carry out any other modification of the Premises without the written consent of the Buying Entity. SPD shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment/ facilities owned by the Buying Entity due to the SPD, the same shall be made good/rectified by the SPD at their cost. f) SPD shall, within thirty (30) days of the Effective Date, submit to the Buying Entity shop drawings of the Project for approval ("Shop Drawings"). If the Buying Entity has any objection/recommendation in the Shop Drawings, it shall communicate the same to SPD within a period of thirty (30) working days of the date of submission of theShop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. g) Subject to any punch-list items which shall be agreed by the SPD as not being material to completion of the Project, the SPD agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date (“Scheduled Completion Date”). Buying Entity shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System. h) If the SPD is unable to commence supply of Solar Power to the Buying Entity by the Scheduled Completion Date, other than for the reasons specified in Article 11 andand 12.2 (Force Majeure or Buying Entity’s Default), the SPD or its contractor shall pay to Buying Entity genuine pre-estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of SECI’s RfS appended as Schedule III to this Agreement. i) The Buying Entity shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement. j) SPD shall fulfill all obligations undertaken by it under this Agreement.

Appears in 1 contract

Sources: Power Purchase Agreement

Installation Work. a) SPD The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RfS RFS No. dated of SECI. SPD shall provide to the Buying Entity a bill of materials listing the major equipment constituting the System. Such bill of materials shall be provided within thirty (30) days of the Commercial Operation Date. b) SPD The Power Producer shall have access as reasonably permitted by the Buying Entity Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the SPD Power Producer shall commission the System with a capacity of approximately kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing. d) SPD The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Buying EntityPurchaser. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, SPD the Power Producer shall not do do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; disturbed ;(c) carryout Carry out any other modification of the Premises without the written consent of the Buying Entity. SPD Purchaser. f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment/ equipment / facilities owned by the Buying Entity Purchaser due to the SPDPower Producer, the same shall be made good/good rectified by the SPD Power Producer at their cost. fg) SPD The Power Producer shall, within thirty fifteen (3015) working days of the Effective Date, submit to the Buying Entity Purchaser shop drawings of the Project for approval ("Shop Drawings"). The drawings will have to be approved from the Power Purchaser within 3 working days from the submission of the drawings. If the Buying Entity Purchaser has any objection/recommendation objection/'recommendation in the Shop Drawings, it he shall communicate the same to SPD Power Producer within a period of thirty ten (3010) working days of the date of submission of theShop the Shop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. g) Subject to any punch-list items which shall be agreed by the SPD the. Purchaser as not being material to completion of the Project, the SPD Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Buying Entity Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System. h) If the SPD Power Producer is unable to commence supply of Solar Power to the Buying Entity Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 andand 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF EXPERT PSU> genuine pre-estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the <NAME OF EXPERT PSU> RFS appended as Schedule VI format as per respective RFS document to this Agreement. i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement. j) Power Producer shall fulfill all obligations undertaken by it under this Agreement.

Appears in 1 contract

Sources: Power Purchase Agreement (Ppa)

Installation Work. a) SPD The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially c o n s t r u c t e d s u b s t a n t i a l l y in accordance a c c o r d a n c e with RfS RF S No…… dated: and the sanction letter issued by CSIR-AMPRI, Bhopal . dated of SECI. SPD shall provide The Power Producer shallprovide to the Buying Entity Purchaser a bill of materials listing the major equipment constituting the System. Such bill of materials shall be provided within thirty (30) 30 days of the Commercial Operation Date.] b) SPD The Power Producer shall have access as reasonably permitted by the Buying Entity Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the SPD Power Producer shall commission the System with a capacity of approximately kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing. d) SPD The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Buying EntityPurchaser. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, SPD the Power Producer shall not do do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; disturbed ;(c) carryout Carry out any other modification of the Premises without the written consent of the Buying Entity. SPD Purchaser. f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment/ equipment / facilities owned by the Buying Entity Purchaser due to the SPDPower Producer, the same shall be made good/good rectified by the SPD Power Producer at their cost. fg) SPD The Power Producer shall, within thirty fifteen (3015) working days of the Effective Date, submit to the Buying Entity Purchaser shop drawings of the Project for approval (a p p r o v a l( "Shop DrawingsD r a w i n g s "). The d r a w i n g s will ha ve to be approved from the Power Purchaser within 3 working days from the submission of the drawings. If the Buying Entity Purchaser has any objection/recommendation objection/'recommendation in the Shop Drawings, it he shall communicate the same to SPD Power Producer within a period of thirty ten (3010) working days of the date of submission of theShop the Shop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. g) . Subject to any punch-list items which shall be agreed by the SPD the. Purchaser as not being material to completion of the Project, the SPD Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Buying Entity Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System. h) If the SPD Power Producer is unable to commence supply of Solar Power to the Buying Entity Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 andand 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF EXPERT PSU> genuine pre-estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the <NAME OF EXPERT PSU> RFS appended as Schedule VI format as per respective RFSdocument to this Agreement. i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement. j) Power Producer shall fulfill all obligations undertaken by it under this Agreement.

Appears in 1 contract

Sources: Power Purchase Agreement

Installation Work. a) SPD The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RfS NoRFS No dated: and the sanction letter issued by <NAME OF EXPERT PSU>. dated of SECI. SPD The Power Producer shall provide to the Buying Entity Purchaser a bill of materials listing the major equipment constituting the System. Such bill of materials shall be provided within thirty (30) 30 days of the Commercial Operation Date. b) SPD The Power Producer shall have access as reasonably permitted by the Buying Entity Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the SPD Power Producer shall commission the System with a capacity of approximately kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing. d) SPD The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Buying EntityPurchaser. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, SPD the Power Producer shall not do do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; disturbed ;(c) carryout Carry out any other modification of the Premises without the written consent of the Buying Entity. SPD Purchaser. f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment/ equipment / facilities owned by the Buying Entity Purchaser due to the SPDPower Producer, the same shall be made good/good rectified by the SPD Power Producer at their cost. fg) SPD The Power Producer shall, within thirty fifteen (3015) working days of the Effective Date, submit to the Buying Entity Purchaser shop drawings of the Project for approval ("Shop Drawings"). The drawings will have to be approved from the Power Purchaser within 3 working days from the submission of the drawings. If the Buying Entity Purchaser has any objection/recommendation objection/'recommendation in the Shop Drawings, it he shall communicate the same to SPD Power Producer within a period of thirty ten (3010) working days of the date of submission of theShop the Shop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. g) . Subject to any punch-list items which shall be agreed by the SPD the. Purchaser as not being material to completion of the Project, the SPD Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Buying Entity Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System. h) If the SPD Power Producer is unable to commence supply of Solar Power to the Buying Entity Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 andand 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF EXPERT PSU> genuine pre-estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the <NAME OF EXPERT PSU> RFS appended as Schedule VI format as per respective RFS document to this Agreement. i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement. j) Power Producer shall fulfill all obligations undertaken by it under this Agreement.

Appears in 1 contract

Sources: Memorandum of Understanding, Power Purchase Agreement, Engineering Procurement & Construction Agreement

Installation Work. a) SPD The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RfS NoRFP No dated: and the sanction letter issued by <NAME OF EXPERT PSU>. dated of SECI. SPD The Power Producer shall provide to the Buying Entity Purchaser a bill ▇▇▇▇ of materials listing the major equipment constituting the System. Such bill ▇▇▇▇ of materials shall be provided within thirty (30) 30 days of the Commercial Operation Date. b) SPD The Power Producer shall have access as reasonably permitted by the Buying Entity Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the SPD Power Producer shall commission the System with a capacity of approximately kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing. d) SPD The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Buying EntityPurchaser. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, SPD the Power Producer shall not do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; disturbed ;(c) carryout Carry out any other modification of the Premises without the written consent of the Buying Entity. SPD Purchaser. f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment/ equipment / facilities owned by the Buying Entity Purchaser due to the SPDPower Producer, the same shall be made good/good rectified by the SPD Power Producer at their cost. fg) SPD The Power Producer shall, within thirty fifteen (3015) working days of the Effective Date, submit to the Buying Entity Purchaser shop drawings of the Project for approval ("Shop Drawings"). The drawings will have to be approved from the Power Purchaser within 3 working days from the submission of the drawings. If the Buying Entity Purchaser has any objection/recommendation objection/'recommendation in the Shop Drawings, it he shall communicate the same to SPD Power Producer within a period of thirty ten (3010) working days of the date of submission of theShop the Shop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. g) . Subject to any punch-list items which shall be agreed by the SPD the. Purchaser as not being material to completion of the Project, the SPD Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Buying Entity Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System. h) If the SPD Power Producer is unable to commence supply of Solar Power to the Buying Entity Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 andand 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF EXPERT PSU> genuine pre- estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the <NAME OF EXPERT PSU> RFP appended as Schedule VI format as per respective RFP document to this Agreement. i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement. j) Power Producer shall fulfil all obligations undertaken by it under this Agreement.

Appears in 1 contract

Sources: Power Purchase Agreement (Ppa)

Installation Work. a) SPD The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RfS NoTender No dated: and the sanction letter issued by <NAME OF RESCO>. dated of SECI. SPD The Power Producer shall provide to the Buying Entity Purchaser a bill of materials listing the major equipment constituting the System. Such bill of materials shall be provided within thirty (30) 30 days of the Commercial Operation Date. b) SPD The Power Producer shall have access as reasonably permitted by the Buying Entity Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the SPD Power Producer shall commission the System with a capacity of approximately kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing. d) SPD The Power Producer shall provide and lay laying the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Buying EntityPurchaser. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, SPD the Power Producer shall not do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; disturbed ;(c) carryout Carry out any other modification of the Premises without the written consent of the Buying Entity. SPD Purchaser. f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment/ equipment / facilities owned by the Buying Entity Purchaser due to the SPDPower Producer, the same shall be made good/good rectified by the SPD Power Producer at their cost. fg) SPD The Power Producer shall, within thirty fifteen (3015) working days of the Effective Date, submit to the Buying Entity shop Purchaser detail drawings of the Project for approval ("Shop Detail Drawings"). The drawings will have to be approved from the Power Purchaser within 03 working days from the submission of the drawings. If the Buying Entity purchaser has any objection/recommendation in the Shop Detail Drawings, it purchaser shall communicate the same to SPD Power Producer within a period of thirty Ten (3010) working days of the date of submission of theShop the detail Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. g) . Subject to any punch-list items which shall be agreed by the SPD Purchaser as not being material to completion of the Project, the SPD Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Buying Entity Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System. h) If the SPD Power Producer is unable to commence supply of Solar Power to the Buying Entity Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 andand 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF PURCHASER> genuine pre- estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the Tender No. …., Dt. … appended as Schedule VI format as per respective Tender document to this Agreement. i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement. j) Power Producer shall fulfil all obligations undertaken by it under this Agreement.

Appears in 1 contract

Sources: Power Purchase Agreement (Ppa)

Installation Work. a) SPD The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RfS NoRFS No dated: and the sanction letter issued by <NAME OF EXPERT PSU>. dated of SECI. SPD The Power Producer shall provide to the Buying Entity Purchaser a bill ▇▇▇▇ of materials listing the major equipment constituting the System. Such bill ▇▇▇▇ of materials shall be provided within thirty (30) 30 days of the Commercial Operation Date. b) SPD The Power Producer shall have access as reasonably permitted by the Buying Entity Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the SPD Power Producer shall commission the System with a capacity of approximately kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing. d) SPD The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Buying EntityPurchaser. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, SPD the Power Producer shall not do do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; disturbed ;(c) carryout Carry out any other modification of the Premises without the written consent of the Buying Entity. SPD Purchaser. f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment/ equipment / facilities owned by the Buying Entity Purchaser due to the SPDPower Producer, the same shall be made good/good rectified by the SPD Power Producer at their cost. fg) SPD The Power Producer shall, within thirty fifteen (3015) working days of the Effective Date, submit to the Buying Entity Purchaser shop drawings of the Project for approval ("Shop Drawings"). The drawings will have to be approved from the Power Purchaser within 3 working days from the submission of the drawings. If the Buying Entity Purchaser has any objection/recommendation objection/'recommendation in the Shop Drawings, it he shall communicate the same to SPD Power Producer within a period of thirty ten (3010) working days of the date of submission of theShop the Shop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. g) . Subject to any punch-list items which shall be agreed by the SPD the. Purchaser as not being material to completion of the Project, the SPD Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Buying Entity Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System. h) If the SPD Power Producer is unable to commence supply of Solar Power to the Buying Entity Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 andand 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF EXPERT PSU> genuine pre-estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the <NAME OF EXPERT PSU> RFS appended as Schedule VI format as per respective RFS document to this Agreement. i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement. j) Power Producer shall fulfill all obligations undertaken by it under this Agreement.

Appears in 1 contract

Sources: Power Purchase Agreement (Ppa)

Installation Work. a) SPD The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RfS NoRFS No dated: and the sanction letter issued by <NAME OF EXPERT PSU>. dated of SECI. SPD The Power Producer shall provide to the Buying Entity Purchaser a bill of materials listing the major equipment constituting the System. Such bill of materials shall be provided within thirty (30) 30 days of the Commercial Operation Date. b) SPD The Power Producer shall have access as reasonably permitted by the Buying Entity Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the SPD Power Producer shall commission the System with a capacity of approximately kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing. d) SPD The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Buying EntityPurchaser. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, SPD the Power Producer shall not do do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; disturbed ;(c) carryout Carry out any other modification of the Premises without the written consent of the Buying Entity. SPD Purchaser. f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment/ equipment / facilities owned by the Buying Entity Purchaser due to the SPDPower Producer, the same shall be made good/good rectified by the SPD Power Producer at their cost. fg) SPD The Power Producer shall, within thirty fifteen (3015) working days of the Effective Date, submit to the Buying Entity Purchaser shop drawings of the Project for approval ("Shop Drawings"). The drawings will have to be approved from the Power Purchaser within 3 working days from the submission of the drawings. If the Buying Entity Purchaser has any objection/recommendation objection/'recommendation in the Shop Drawings, it he shall communicate the same to SPD Power Producer within a period of thirty ten (3010) working days of the date of submission of theShop the Shop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. g) Subject to any punch-list items which shall be agreed by the SPD the. Purchaser as not being material to completion of the Project, the SPD Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Buying Entity Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System. h) If the SPD Power Producer is unable to commence supply of Solar Power to the Buying Entity Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 andand 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF EXPERT PSU> genuine pre-estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the <NAME OF EXPERT PSU> RFS appended as Schedule VI format as per respective RFS document to this Agreement. i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement. j) Power Producer shall fulfill all obligations undertaken by it under this Agreement.

Appears in 1 contract

Sources: Memorandum of Understanding, Power Purchase Agreement, Engineering Procurement & Construction Agreement