Interconnection Facilities Engineering Procurement and Construction Sample Clauses
The "Interconnection Facilities Engineering, Procurement, and Construction" clause defines the responsibilities and processes for designing, sourcing, and building the infrastructure needed to connect a project—such as a power plant or renewable energy facility—to the existing utility grid. This clause typically outlines which party is responsible for engineering studies, obtaining necessary equipment, and managing construction activities, as well as the standards and timelines that must be met. Its core function is to ensure that all technical and logistical aspects of interconnection are clearly assigned and managed, thereby reducing delays, cost overruns, and disputes related to connecting the project to the grid.
POPULAR SAMPLE Copied 3 times
Interconnection Facilities Engineering Procurement and Construction. Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.
Interconnection Facilities Engineering Procurement and Construction. 5.1 Options 5.1.1 Standard Option 5.1.2 Alternate Option 5.1.3 Option to Build 5.1.4 Negotiated Option 5.2 General Conditions Applicable to Option to Build 5.3 Liquidated Damages 5.4 Power System Stabilizers 5.5 Equipment Procurement 5.5.1 5.5.2 5.5.3 5.6 Construction Commencement 5.6.1 5.6.2 5.6.3 5.6.4 5.7 Work Progress 5.8 Information Exchange 5.9 Limited Operation
Interconnection Facilities Engineering Procurement and Construction. 5.1 Options 5.1.1 Standard Option 5.1.2 Alternate Option 5.1.3 Option to Build 5.1.4 Negotiated Option 5.2 General Conditions Applicable to Option to Build 5.3 Liquidated Damages
Interconnection Facilities Engineering Procurement and Construction. 5.1 Options .................................................................................................................................. 5.1.1 Standard Option ....................................................................................................... 5.1.2 Alternate Option........................................................................................................ 5.1.3 Option to Build .......................................................................................................... 5.1.4 Negotiated Option..................................................................................................... 5.2 General Conditions Applicable to Option to Build ................................................................. 5.3 Liquidated Damages..............................................................................................................
Interconnection Facilities Engineering Procurement and Construction. 5.1 Options 5.1.1 Standard Option 5.1.2 Alternate Option 5.1.3 Option to Build 5.1.4 Negotiated Option
Interconnection Facilities Engineering Procurement and Construction. 5.1 Options. Option to Build. Negotiated Option. 5.2 General Conditions Applicable to Option to Build. 5.3 Liquidated Damages.
5.4 Power System Stabilizers. 5.5 Equipment Procurement. 5.6 Construction Commencement. 5.7 Work Progress. 5.8 Information Exchange.
Interconnection Facilities Engineering Procurement and Construction.
5.1 Options Intentionally left blank
5.2 General Conditions Applicable to Option to Build. Intentionally left blank
5.3 Liquidated Damages. Intentionally left blank
5.4 Power System Stabilizers. Intentionally left blank
5.5 Equipment Procurement. Intentionally left blank
Interconnection Facilities Engineering Procurement and Construction. 1Options. Unless otherwise mutually agreed to by Developer and Transmission Owner, Developer shall select the In-Service Date, Initial Synchronization Date, and Commercial Operation Date; and either Standard Option or Alternate Option set forth below for completion of the Transmission Owner’s Attachment Facilities and System Upgrade Facilities as set forth in Appendix A hereto, and such dates and selected option shall be set forth in Appendix B hereto.
Interconnection Facilities Engineering Procurement and Construction. 5.1 Options. Intentionally left blank. Standard Option. Intentionally left blank. Alternate Option. Intentionally left blank. Option to Build. Intentionally left blank. Negotiated Option. Intentionally left blank
5.2 General Conditions Applicable to Option to Build. Intentionally left blank.
5.3 Liquidated Damages. Intentionally left blank.
5.4 Power System Stabilizers. Intentionally left blank.
5.5 Equipment Procurement. Intentionally left blank.
Interconnection Facilities Engineering Procurement and Construction. 5.1 Options