Interconnection Studies. Cooperative may perform interconnection studies, which shall include service study, coordination study, and utility system impact study, as needed and determined in the sole discretion of the Cooperative. In instances where such studies are deemed necessary, the scope of such studies shall be based on the characteristics of the particular distributed generation facility to be interconnected and the Cooperative’s distribution system at the specific proposed location. Cooperative may charge Member fees for Pre-Interconnection Studies that recover the costs of performing such studies. Any modifications or additions to the Cooperative’s Electric system identified through the interconnection study as required for the safe and reliable interconnection of Member’s facility shall be solely at the Member’s expense. Member shall not acquire any ownership in such modifications or additions to Cooperative’s electric distribution system.
Appears in 4 contracts
Sources: Distributed Generation Agreement, Distributed Generation Agreement, Distributed Generation Agreement