Interference by Indosat Sample Clauses

Interference by Indosat. (a) Indosat shall not interfere with the operations on the Tower or the use of the Site by any Prior User, provided that such Prior User’s Equipment was and is being installed, maintained and operated according to standard industry practices and applicable contracts with Owner. (b) In the event Owner reasonably determines, based on standard and accepted engineering practices, that (i) such Prior User’s Equipment was and is being installed, maintained and operated according to standard industry practices and applicable contracts with Owner, and (ii) Indosat’s Installed Equipment is interfering with the operation of such Prior User’s Equipment, authorized frequency spectrum or signal strength, Owner shall notify Indosat of such determination (the “Indosat Interference Determination”). (c) If Indosat disputes the Indosat Interference Determination, it shall notify Owner of such dispute within forty-eight (48) hours of receiving such Indosat Interference Determination (a “Indosat Interference Dispute”), in the absence of which Indosat shall be deemed to have accepted the Indosat Interference Determination. (d) In the event Indosat submits an Indosat Interference Dispute in accordance with Section 15.1(c), the Indosat Interference Dispute shall be resolved in accordance with Section 15.3. (e) In the event Indosat accepts the Indosat Interference Determination in accordance with Section 15.1(b), Indosat shall, within forty-eight (48) hours of receiving the Indosat Interference Determination, take all steps reasonably necessary to eliminate the interference, with the exception of ceasing Indosat’s operations at that Site. (f) If Indosat cannot eliminate or resolve such interference within such forty-eight (48) hour period, or in the event Indosat raises an Indosat Interference Dispute and the independent engineer determines (in accordance with Section 15.3) that the Indosat Interference Determination was made correctly, Owner shall have the right to require that Indosat turn off all or part of its Installed Equipment and only turn on such Installed Equipment during Off-Peak hours in order to test whether such interference continues or has been satisfactorily eliminated, provided that if such interference has been satisfactorily eliminated, Indosat shall have the right to resume its normal use of such Installed Equipment. In the event that Indosat is unable to resolve or eliminate, to the reasonable satisfaction of Owner, such interference within thirty (30) days ...

Related to Interference by Indosat

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.

  • Maintenance by Tenant Subject to the provisions of Paragraph 13.2, 21 and 22 below, throughout the Term, Tenant shall, at its sole expense, (1) keep and maintain in good order and condition the Building and the Premises and repair the Building and the Premises and every part thereof, including interior and exterior glass, windows, window frames and casements, interior and exterior doors and door frames and door closers; interior and exterior lighting (including, without limitation, light bulbs and ballasts), the roof covering; the Systems serving the Premises and the Building; interior and exterior signage, interior demising walls and partitions, equipment, interior painting and interior walls and floors, and the roll-up doors, ramps and dock equipment, including, without limitation, dock bumpers, dock plates, dock seals, dock levelers and dock lights located in or on the Premises (excepting only those portions of the Building or the Project to be maintained by Landlord, as provided in Paragraph 13.2 below), (2) furnish all expendables, including light bulbs, paper goods and soaps, used in the Premises, and (3) keep and maintain in good order and condition and repair and replace all of Tenant's security systems in or about or serving the Premises. Tenant shall not do nor shall Tenant allow Tenant's Agents to do anything to cause any damage, deterioration or unsightliness to the Premises, the Building or the Project. Tenant shall perform its obligations under this Paragraph 13.1 in accordance with maintenance and repair standards adopted by Landlord from time to time for the Project. Tenant shall cause to be furnished to Landlord on not less than a quarterly basis maintenance reports on all Systems and the roof of the Building prepared by a qualified vendor or consultant, and Tenant shall promptly perform any maintenance tasks recommended by such reports or otherwise required by Landlord to cause the Premises and the Systems to comply with Landlord's maintenance and repair standards.

  • Maintenance by Landlord Tenant and its employees, customers and licensees shall have the non-exclusive right to use the parking areas, if any, as may be designated by Landlord in writing, subject to such reasonable rules and regulations as Landlord may from time to time prescribe. Further, in multiple occupancy buildings, Landlord shall perform the roof, paving, and landscape maintenance, exterior painting and common sewage line plumbing which are otherwise Tenant's obligations under Subsection 2.2.2(a) above, and Tenant shall, in lieu of the obligations set forth under Subsection 2.2.2(a) above with respect to such items, be liable for its proportionate share (as defined in Subsection 2.2.1(b) above) of the cost and expense of Building maintenance and the care for the grounds around the Building, including but not limited to, the mowing of grass, care of shrubs, general landscaping, maintenance of parking areas, driveways and alleys, roof maintenance, exterior repainting and common sewage line plumbing; provided, however, that Landlord shall have the right to require Tenant to pay such other reasonable proportion of said mowing, shrub care and general landscaping costs as may be determined by Landlord in its sole discretion; and further provided that if Tenant or any other particular tenant of the Building can be clearly identified as being responsible for obstruction or stoppage of the common sanitary sewage line then Tenant, if Tenant is responsible, or such other responsible tenant, shall pay the entire cost thereof, upon demand, as additional rent. Tenant shall pay/4// when due its share, determined as aforesaid, of such costs and expenses along with the other tenants of the Building to Landlord upon demand, as Additional Rent, for the amount of its share of such costs and expenses in the event Landlord elects to perform or cause to be performed such work. Such share shall include a management fee equal to five percent (5%) of the Rent for each Lease Year, administrative and accounting costs, and a/5// reserve for asphalt, roof repairs and repainting.

  • AUDIT OF LICENSED PRODUCT USAGE Contractor shall have the right to periodically audit, no more than annually, at Contractor’s expense, use of licensed Product at any site where a copy of the Product resides provided that: (i) Contractor gives Licensee(s) at least thirty (30) days advance written notice, (ii) such audit is conducted during such party’s normal business hours, (iii) the audit is conducted by an independent auditor chosen on mutual agreement of the parties. Contractor shall recommend a minimum of three (3) auditing/accounting firms from which the Licensee will select one (1). In no case shall the Business Software Alliance (BSA), Software Publishers Association (SPA), Software and Industry Information Association (SIIA) or Federation Against Software Theft (FAST) be used directly or indirectly to conduct audits, or be recommended by Contractor; (iv) Contractor and Licensee are each entitled to designate a representative who shall be entitled to participate, and who shall mutually agree on audit format, and simultaneously review all information obtained by the audit. Such representatives also shall be entitled to copies of all reports, data or information obtained from the audit; and (v) if the audit shows that such party is not in compliance, Licensee shall be required to purchase additional licenses or capacities necessary to bring it into compliance and shall pay for the unlicensed capacity at the NYS Net Price in effect at time of audit, or if none, then at the Contractor’s U.S. Commercial list price. Once such additional licenses or capacities are purchased, Licensee shall be deemed to have been in compliance retroactively, and Licensee shall have no further liability of any kind for the unauthorized use of the software.

  • Maintenance Outages If Seller reasonably determines that it is necessary to schedule a Maintenance Outage, Seller shall notify Buyer of the proposed Maintenance Outage at least five (5) days before the outage begins (or such shorter period to which Buyer may reasonably consent in light of then existing conditions). Upon such notice, the Parties shall plan the Maintenance Outage to mutually accommodate the reasonable requirements of Seller and the service obligations of Buyer; provided, however, that, unless Buyer otherwise consents, such consent not to be unreasonably withheld, no Maintenance Outage may be scheduled between the hour ending 0700 through the hour ending 2200, Monday through Saturday, during the time period commencing on May 15 and concluding on September 15. Notice of a proposed Maintenance Outage shall include the expected start date and time of the outage, the amount of Capacity of the Facility that will not be available, and the expected completion date and time of the outage. Seller shall give Buyer notice of the Maintenance Outage as soon as Seller determines that the Maintenance Outage is necessary. Buyer shall promptly respond to such notice and may request reasonable modifications in the schedule for the outage. Seller shall use all reasonable efforts to comply with any request to modify the schedule for a Maintenance Outage. Seller shall notify Buyer of any subsequent changes in Capacity available to Buyer or any changes in the Maintenance Outage completion date and time. As soon as practicable, any notifications given orally shall be confirmed in writing. Seller shall take all reasonable measures and exercise its best efforts in accordance with Prudent Electrical Practices to minimize the frequency and duration of Maintenance Outages.