INTERFERENCE WITH RAILROAD OPERATIONS Sample Clauses

INTERFERENCE WITH RAILROAD OPERATIONS. 5.1 The contractor shall arrange and conduct all work so that there shall be no interference with the Railroad’s operations, including train, signal, telephone and telegraphic services; or damage to the Railroad’s property; poles, wires and other facilities of tenants, licensees, easement grantees and invitees on the Railroad’s right of way. Whenever work may affect the operations or safety of trains, the method of doing such work shall first be submitted to the Railroad Engineer for approval, but such approval shall not relieve the contractor from liability. Any work to be performed by the contractor that requires flagging service or inspection service shall be deferred by the contractor until the flagging service required by the Railroad is available at the job site. 5.2 Whenever work within the Railroad’s right of way is of such a nature that impediment to the Railroad’s operations is unavoidable, such as use of runaround tracks or necessity for reduced speed, the contractor shall schedule and conduct these operations so that such impediment is reduced to the absolute minimum. 5.3 Should conditions arising from, or in connection with the work require that immediate and unusual provisions be made to protect the Railroad’s operations and property, the contractor shall make such provisions. If in the judgment of the Railroad Engineer, or the Engineer if the Railroad Engineer is absent, such provision is insufficient, the Railroad Engineer or Engineer may require or provide such provisions as deem necessary. In any event, such provisions shall be at the contractor's expense and without cost to the Railroad or the Commission. 5.4 The contractor shall be responsible for any damage to the Railroad as a result of work on the project, which shall include but not be limited to interference with the normal movement of trains caused exclusively by the work performed by the contractor. The contractor shall be responsible for damages for the Railroad’s train delays that are caused exclusively by the contractor. The Railroad agrees not to perform any act to unnecessarily cause any train delay. The damages for train delays per freight hour will be billed at an average rate per hour as determined from the Railroad’s records. These records shall be provided by the Railroad, upon request, to the Commission or the Commission’s contractor.
INTERFERENCE WITH RAILROAD OPERATIONS. Licensee shall keep CP fully apprised of its proposed activities on the Property so as to prevent any interference with the operations of CP's trains or equipment (or trains or equipment of others) operating on or near the Property.
INTERFERENCE WITH RAILROAD OPERATIONS. The provisions of Section XIII.C.1 of the Construction Agreement are incorporated herein by this reference.

Related to INTERFERENCE WITH RAILROAD OPERATIONS

  • Compliance with Environmental Requirements 50.1 The Contractor shall provide the goods and/or Services required under the Contract in accordance with applicable laws and the Authority’s environmental policy, which is to conserve energy, water and other resources, reduce waste and phase out the use of ozone depleting substances and minimise the release of greenhouse gases, volatile organic compounds and other substances damaging to health and the environment. 50.2 The Authority is committed to promoting a low carbon, high growth, global economy. The Contractor shall work with the Authority regarding any environmental or sustainability issues as the Authority considers relevant, comply with contractual obligations and carry out any reasonable request to ensure the protection of the environment, society and the economy and promotion of sustainable development and sustainable procurement throughout the Contract Period. 50.3 All written outputs, including reports, produced in connection with the Contract shall (unless otherwise specified) be produced on recycled paper containing at least 80% post consumer waste and used on both sides where appropriate. 50.4 Nothing in this Condition 50 shall relieve the obligations of the Contractor to comply with its statutory duties and Good Industry Practice.

  • Compliance with Environmental Laws Except as otherwise described in the Prospectus, and except as would not, individually or in the aggregate, result in a Material Adverse Change (i) neither the Company nor any of its subsidiaries is in violation of any federal, state, local or foreign law or regulation relating to pollution or protection of human health or the environment (including, without limitation, ambient air, surface water, groundwater, land surface or subsurface strata) or wildlife, including without limitation, laws and regulations relating to emissions, discharges, releases or threatened releases of chemicals, pollutants, contaminants, wastes, toxic substances, hazardous substances, petroleum and petroleum products (collectively, “Materials of Environmental Concern”), or otherwise relating to the manufacture, processing, distribution, use, treatment, storage, disposal, transport or handling of Materials of Environmental Concern (collectively, “Environmental Laws”), which violation includes, but is not limited to, noncompliance with any permits or other governmental authorizations required for the operation of the business of the Company or its subsidiaries under applicable Environmental Laws, or noncompliance with the terms and conditions thereof, nor has the Company or any of its subsidiaries received any written communication, whether from a governmental authority, citizens group, employee or otherwise, that alleges that the Company or any of its subsidiaries is in violation of any Environmental Law; (ii) there is no claim, action or cause of action filed with a court or governmental authority, no investigation with respect to which the Company has received written notice, and no written notice by any person or entity alleging potential liability for investigatory costs, cleanup costs, governmental responses costs, natural resources damages, property damages, personal injuries, attorneys’ fees or penalties arising out of, based on or resulting from the presence, or release into the environment, of any Material of Environmental Concern at any location owned, leased or operated by the Company or any of its subsidiaries, now or in the past (collectively, “Environmental Claims”), pending or, to the Company’s knowledge, threatened against the Company or any of its subsidiaries or any person or entity whose liability for any Environmental Claim the Company or any of its subsidiaries has retained or assumed either contractually or by operation of law; and (iii) to the best of the Company’s knowledge, there are no past or present actions, activities, circumstances, conditions, events or incidents, including, without limitation, the release, emission, discharge, presence or disposal of any Material of Environmental Concern, that reasonably could result in a violation of any Environmental Law or form the basis of a potential Environmental Claim against the Company or any of its subsidiaries or against any person or entity whose liability for any Environmental Claim the Company or any of its subsidiaries has retained or assumed either contractually or by operation of law.