IS CHANGED TO. The RE may require 3 color paper copies of the tabular reports, as specified in 153.03.02.2, and a printed network diagram (PERT) on 36 22-inch sheets detailing the activity relationships.
Appears in 2 contracts
Sources: Construction Contract, Construction Contract
IS CHANGED TO. The RE may require 3 color paper copies of the tabular reports, as specified in 153.03.02.2, and a printed network diagram (PERT) on 36 × 22-inch sheets detailing the activity relationships.
Appears in 2 contracts
Sources: Contract for Resurfacing and Bridge Deck Repairs, Construction Contract