Joint Voltage Stability Operating Protocol Sample Clauses

The Joint Voltage Stability Operating Protocol is a clause that establishes coordinated procedures and standards for maintaining voltage stability across interconnected electrical systems managed by multiple parties. It typically outlines the responsibilities of each party, the methods for monitoring voltage levels, and the steps to be taken in the event of voltage instability, such as communication protocols and corrective actions. By providing a clear framework for collaboration, this clause helps prevent voltage fluctuations that could disrupt service or damage equipment, ensuring reliable and stable operation of the shared power grid.
Joint Voltage Stability Operating Protocol. Voltage stability or collapse problems have the potential to cause cascading outages and therefore must be closely coordinated to maintain reliable operations. The Parties were formed to have a regional perspective that looks beyond the boundary of a single control area. As such, the Parties will coordinate operations in accordance with good utility practice in order to maintain stable voltage profiles throughout the respective Party’s zones of operations.
Joint Voltage Stability Operating Protocol. To avoid any voltage stability or collapse problems, the Parties shall coordinate their operations to maintain stable voltage profiles throughout their respective RC Areas. The Parties shall also coordinate their established daily voltage/reactive power management plans.

Related to Joint Voltage Stability Operating Protocol

  • Signaling protocol 4.1.3.1 SS7 Signaling is AT&T-21STATE’s preferred method for signaling. Where MF signaling is currently used, the Parties agree to use their best efforts to convert to SS7. If SS7 services are provided by AT&T-21STATE, they will be provided in accordance with the provisions of the applicable access tariffs. 4.1.3.2 Where MF signaling is currently used, the Parties agree to interconnect their networks using MF or dual tone MF (DTMF) signaling, subject to availability at the End Office Switch or Tandem Switch at which Interconnection occurs. The Parties acknowledge that the use of MF signaling may not be optimal. AT&T-21STATE will not be responsible for correcting any undesirable characteristics, service problems or performance problems that are associated with MF/SS7 inter-working or the signaling protocol required for Interconnection with CLEC employing MF signaling.

  • System Access Control Data processing systems used to provide the Cloud Service must be prevented from being used without authorization.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.