KEY INFORMATION TABLE. Commercial Information Subject Clause Key Information (a) [the modules, support structures, inverters, transformers, switchgear, SCADA System, monitoring and site surveillance system, the Spares Stock (if applicable) and all other equipment required for the Facility, save to the extent any of this equipment and materials forms part of the Balance of Plant]. PV System Delivery Point 4.14(b) [●]2 Scheduled Equipment Acceptance Date 4.14(b) [●] Lender's Performance Standards3 5.1 [insert required performance standards of the Lender e.g. "Equator Principles" and/or "IFC Performance Standards" or][Not applicable]. Industry Standards 5.4(b) [IEC standard 62446 (Photovoltaic (PV) systems - requirements for testing, documentation and maintenance)]. Defects Warranty Period 11.2(a) [●] commencing on the Commercial Operation Date as may be extended in accordance with this Agreement. Modules Breakage Threshold 11.2(b) [insert number or percentage of Modules]. Scheduled COD 12.2 [●] Delay Liquidated Damages Rate 12.3 [●] per day of delay. Delay Liquidated Damages Cap4 12.4 [●] Commercial Operation Longstop Date 12.5 [●] Minimum Guaranteed Capacity 15.2 [●] Default Rate 23.1(f) [●] Termination Fee 26.3 [●] Maximum Liability 24.1(a)(vi) [●] Cost or Savings Threshold 1.1 [●] Governing Law5 37.14 [●] Mediation Rules 38.2 [●] Expert Appointing Authority6 38.3(c) [●] Arbitration Language 38.4(b) [●] Arbitration Seat7 38.4(c) [●] Lender Direct Agreement 4.4(a) [Applicable] [Not Applicable]. Man-Made Underground Structures as a Relevant Event entitling time relief8 6.3 and 13.3(b) [Applicable] [Not Applicable]. Man-Made Underground Structures entitling cost relief9 6.3 and 13.3(b) [Applicable] [Not Applicable].
Appears in 1 contract
Sources: Installation Agreement
KEY INFORMATION TABLE. Commercial Information Subject Clause Key Information
(a) [the modules, support structures, inverters, transformers, switchgear, SCADA System, monitoring and site surveillance system, the Spares Stock (if applicable) and all other equipment required for the Facility, save to the extent any of this equipment and materials forms part of the Balance of Plant]. PV System Delivery Point 4.14(b) [●]2 Scheduled Equipment Acceptance Date 4.14(b) [●] Lender's Performance Standards3 5.1 [insert required performance standards of the Lender e.g. "Equator Principles" and/or "IFC Performance Standards" or][Not or] [Not applicable]. Industry Standards 5.4(b) [IEC standard 62446 (Photovoltaic (PV) systems - requirements for testing, documentation and maintenance)]. Defects Warranty Period 11.2(a) [●] commencing on the Commercial Operation Date as may be extended in accordance with this Agreement. Modules Breakage Threshold 11.2(b) [insert number or percentage of Modules]. Scheduled COD 12.2 [●] Delay Liquidated Damages Rate 12.3 [●] per day of delay. Delay Liquidated Damages Cap4 12.4 [●] Commercial Operation Longstop Date 12.5 [●] Minimum Guaranteed Capacity 15.2 [●] Default Rate 23.1(f) [●] Termination Fee 26.3 [●] Maximum Liability 24.1(a)(vi) [●] Cost or Savings Threshold 1.1 [●] Governing Law5 37.14 37.15 [●] Mediation Rules 38.2 [●] Expert Appointing Authority6 38.3(c) [●] Arbitration Language 38.4(b) [●] Arbitration Seat7 38.4(c) [●] Lender Direct Agreement 4.4(a) [Applicable] [Not Applicable]. Man-Made Underground Structures as a Relevant Event entitling time relief8 6.3 and 13.3(b) [Applicable] [Not Applicable]. Man-Made Underground Structures entitling cost relief9 6.3 and 13.3(b) [Applicable] [Not Applicable].
Appears in 1 contract
Sources: Installation Agreement