Common use of Laboratory Waste Clause in Contracts

Laboratory Waste. All underground laboratory waste lines and risers at 4 locations throughout the building stubbed out at each floor level for future tenant connection. • Monitoring port installed at exterior of building. • Fire Alarm Control Panel in place with all required devices located within finished common areas. • Fire Sprinkler riser installed to each floor with distribution piping and sprinklers installed on each floor. • Three 4 inch conduits installed from exterior pull box to MPOE located ground floor. Eight 4 inch conduits installed below slab from central IDF on ground floor for future tenant use. • Telephone/data rooms constructed on each floor. • DI water system. • Central Clean Dry Air (CDA) and vacuum equipment. • Distributed gases. ▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇ ARCHITECTURAL DRAWINGS PREPARED BY ▇▇▇ ▇▇▇▇▇▇▇▇ A-001 OVERALL SITE PLAN A-002 ENLARGED SERVICE YARD PLAN AND DETAILS A-003 SITE DETAILS A-004 ACCESSIBILITY REQUIREMENTS A-005 ENLARGED SITE PLAN A-101 1ST LEVEL FLOOR PLAN A-102 2ND LEVEL FLOOR PLAN A-103 3RD LEVEL FLOOR PLAN A-104 4TH LEVEL FLOOR PLAN A-105 ROOF LEVEL FLOOR PLAN A-106 PENTHOUSE ROOF PLAN A-101S 1ST LEVEL SLAB PLAN A-102S 2ND LEVEL SLAB PLAN A-103S 3RD LEVEL SLAB PLAN A-104S 4TH LEVEL SLAB PLAN A-105S ROOF LEVEL SLAB PLAN A-201 NORTH & EAST ELEVATIONS A-202 SOUTH & WEST ELEVATIONS A-301 LONGITUDINAL BUILDING SECTION A-302 CROSS BUILDING SECTION A-311 WALL SECTIONS A-312 WALL SECTIONS A-401 TOILET CORE ENLARGED PLANS & ELEVATIONS A-402 ENLARGED PLANS ELEVATORS & STAIRS A-403 ELEVATOR SECTIONS A-404 STAIR #1 SECTIONS A-405 STAIR #2 SECTIONS A-406 LOBBY ENLARGED PLAN A-407 LOBBY REFLECTED CEILING PLAN A-408 LOBBY REFLECTED CEILING PLAN - SECOND LEVEL A-411 LOBBY INTERIOR ELEVATIONS A-421 FINISH GENERAL NOTES AND SCHEDULE A-501 EXTERIOR DETAILS A-502 EXTERIOR DETAILS A-503 EXTERIOR DETAILS A-504 EXTERIOR DETAILS A-507 WALL SECTION DETAILS A-508 PENTHOUSE & ROOF SCREEN ELEVATIONS A-510 INTERIOR FRAMING DETAILS A-511 PENETRATION DETAILS A-512 EXTERIOR DETAILS - CANOPY DETAILS A-513 ROOF DETAILS A-514 ROOF DETAILS A-515 WATERPROOFING DETAILS A-520 RATED WALL DETAILS A-521 RATED WALL DETAILS A-523 INTERIOR DETAILS - ELEVATOR A-524 INTERIOR DETAILS- STAIR & RAILING A-525 INTERIOR DETAILS - CEILING A-526 INTERIOR DETAILS - LOBBY A-527 INTERIOR DETAILS - RECEPTION DESK A-52 MISCELLANEOUS DETAILS A-601 WALL TYPE SCHEDULE A-602 DOOR SCHEDULE A-604 WINDOW SCHEDULE ▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇ MECHANICAL DRAWINGS PREPARED BY AEI AFFILIATED ENGINEERS M0-1 MECHANICAL ABBREVIATIONS AND SYMBOLS M0-2 MECHANICAL TITLE 24 COMPLIANCE FORMS M0-3 MECHANICAL TITLE 24 COMPLIANCE FORMS M1-01 MECHANICAL SITE PLAN M2-1 MECHANICAL 1ST LEVEL FLOOR PLAN M2-2 MECHANICAL 2ND LEVEL FLOOR PLAN M2-3 MECHANICAL 3RD LEVEL FLOOR PLAN M2-4 MECHANICAL4TH LEVEL FLOOR PLAN M2-5 MECHANICAL 5TH LEVEL FLOOR PLAN M3-1 MECHANICAL ROOF PIPING PLAN M4-1 CHILLED AND BOILER ROOM ENLARGED PLAN M6-1 MECHANICAL SECTIONS M7-1 MECHANICAL AIR FLOW DIAGRAM M7-2 MECHANICAL CHW & HW FLOW DIAGRAMS M8-1 MECHANICAL DETAILS M8-2 MECHANICAL DETAILS M9-1 MECHANICAL SCHEDULES ▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇ FIRE PROTECTION DRAWINGS PREPARED BY AEI AFFILIATED ENGINEERS FP2-1 FIRE PROTECTION 1ST LEVEL FLOOR PLAN FP2-2 FIRE PROTECTION 2ND LEVEL FLOOR PLAN FP2-3 FIRE PROTECTION 3RD LEVEL FLOOR PLAN FP2-4 FIRE PROTECTION 4TH LEVEL FLOOR PLAN FP2-5 FIRE PROTECTION 5TH LEVEL FLOOR PLAN FP7-1 FIRE PROTECTION RISER DIAGRAM FP8-1 FIRE PROTECTION DETAILS ELECTRICAL ▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇ ELECTRICAL DRAWINGS PREPARED BY AEI AFFILIATED ENGINEERS E0-1 ELECTRICAL SYMBOLS AND ABBREVIATIONS E0-2 ELECTRICAL TITLE 24 E0-3 ELECTRICAL TITLE 24 E1-1 ELECTRICAL SITE PLAN E2-1 ELECTRICAL POWER 1ST LEVEL FLOOR PLAN E2-2 ELECTRICAL POWER 2ND LEVEL FLOOR PLAN E2-3 ELECTRICAL POWER 3RD LEVEL FLOOR PLAN E2-4 ELECTRICAL POWER 4TH LEVEL FLOOR PLAN E2-5 ELECTRICAL POWER 5TH LEVEL FLOOR PLAN E3-1 ELECTRICAL POWER 1ST LEVEL FLOOR PLAN E3-2 ELECTRICAL POWER 2ND LEVEL FLOOR PLAN E3-3 ELECTRICAL POWER 3RD LEVEL FLOOR PLAN E3-4 ELECTRICAL POWER 4TH LEVEL FLOOR PLAN E3-5 ELECTRICAL POWER 5TH LEVEL FLOOR PLAN E4-1 ELECTRICAL SPECIAL SYSTEMS 1ST LEVEL FLOOR PLAN E4-2 ELECTRICAL SPECIAL SYSTEMS 2ND LEVEL FLOOR PLAN E4-3 ELECTRICAL SPECIAL SYSTEMS 3RD LEVEL FLOOR PLAN E4-4 ELECTRICAL SPECIAL SYSTEMS 4TH LEVEL FLOOR PLAN E4-5 ELECTRICAL SPECIAL SYSTEMS 5TH LEVEL FLOOR PLAN E5-1 ELECTRICAL PANEL SCHEDULES E6-1 ENLARGED ELECTRICAL ROOMS - 1ST FLOOR PLANS E6-2 ENLARGED ELECTRICAL ROOMS - 1ST, 2ND, 3RD 4TH FLOOR PLANS E7-1 ELECTRICAL ONE-LINE RISER DIAGRAM E7-2 ELECTRICAL EMERGENCY ONE-LINE RISER DIAGRAM E7-3 ELECTRICAL FIRE ALARM RISER DIAGRAM E7-4 ELECTRICAL GROUNDING RISER DIAGRAM E7-5 ELECTRICAL PATHWAY RISER DIAGRAM E8-1 ELECTRICAL SECTIONS AND DETAILS E 9-1 ELECTRICAL LIGHTING FIXTURE SCHEDULE E 9-2 ELECTRICAL FEEDER SCHEDULES & LOAD SUMMARY ▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇ PLUMBING DRAWINGS PREPARED BY AEI AFFILIATED ENGINEERS P0-1 PLUMBING SYMBOLS, ABBREVIATIONS AND NOTES P1-0 PLUMBING SITE PLAN P2-0 PLUMBING UNDERFLOOR PLAN P2-1 PLUMBING 1ST LEVEL FLOOR PLAN P2-2 PLUMBING 2ND LEVEL FLOOR PLAN P2-3 PLUMBING 3RD LEVEL FLOOR PLAN P2-4 PLUMBING 4TH LEVEL FLOOR PLAN P2-5 PLUMBING PENTHOUSE / ROOF PLAN P4-1 PLUMBING ENLARGED RESTROOM PLANS P7-1 PLUMBING DOMESTIC WATER RISER DIAGRAM P7-2 PLUMBING SANITARY WASTE AND VENT RISER DIAGRAM P7-3 PLUMBING LAB WASTE AND VENT RISER DIAGRAM P7-4 PLUMBING STORM DRAINAGE RISER DIAGRAM P7-5 PLUMBING NATURAL GAS RISER DIAGRAM P7-6 PLUMBING WASTE WATER RECOVERY SYSTEM RISER DIAGRAM P8-1 PLUMBING DETAILS P9-1 PLUMBING SCHEDULES T-24 TITLE 24 ENERGY CALCULATIONS

Appears in 2 contracts

Sources: Sub Sublease (Carmot Therapeutics Inc.), Sub Sublease (Carmot Therapeutics Inc.)