Service Management Effective support of in-scope services is a result of maintaining consistent service levels. The following sections provide relevant details on service availability, monitoring of in-scope services and related components.
Virus Management DST shall maintain a malware protection program designed to deter malware infections, detect the presence of malware within DST environment.
Electronic Record Search The Reporting Finnish Financial Institution must review electronically searchable data maintained by the Reporting Finnish Financial Institution for any of the following U.S. indicia: a) Identification of the Account Holder as a U.S. citizen or resident; b) Unambiguous indication of a U.S. place of birth; c) Current U.S. mailing or residence address (including a U.S. post office box); d) Current U.S. telephone number; e) Standing instructions to transfer funds to an account maintained in the United States; f) Currently effective power of attorney or signatory authority granted to a person with a U.S. address; or g) An “in-care-of” or “hold mail” address that is the sole address the Reporting Finnish Financial Institution has on file for the Account Holder. In the case of a Preexisting Individual Account that is a Lower Value Account, an “in-care-of” address outside the United States or “hold mail” address shall not be treated as U.S. indicia.
Traffic Management 9.2.1 During the Operating Period, Developer shall be responsible for the general management of traffic on the Project. Developer shall manage traffic so as to preserve and protect safety of traffic on the Project and Related Transportation Facilities and, to the maximum extent practicable, to avoid disruption, interruption or other adverse effects on traffic flow, throughput or level of service on the Project and Related Transportation Facilities. Developer shall conduct traffic management in accordance with all applicable Technical Provisions, Technical Documents, Laws and Governmental Approvals, and in accordance with the Traffic Management Plan. 9.2.2 Developer shall prepare and submit to TxDOT and the Independent Engineer for TxDOT approval a Traffic Management Plan for managing traffic on the Project and Related Transportation Facilities after the commencement of traffic operations on any portion of the Project, addressing (a) orderly and safe movement and diversion of traffic on Related Transportation Facilities during Project construction, (b) orderly and safe movement of traffic on the Project and (c) orderly and safe diversion of traffic on the Project and Related Transportation Facilities necessary in connection with field maintenance and repair work or Renewal Work or in response to Incidents, Emergencies and lane closures. Developer shall prepare the Traffic Management Plan according to the schedule set forth in the Technical Provisions. The Traffic Management Plan shall comply with the Technical Provisions and Technical Documents concerning traffic management and traffic operations. Developer shall carry out all traffic management during the Term in accordance with the approved Traffic Management Plan. 9.2.3 Developer shall implement the Traffic Management Plan to promote safe and efficient operation of the Project and Related Transportation Facilities at all times during the course of any construction or operation of the Project and during the Utility Adjustment Work. 9.2.4 TxDOT shall have at all times, without obligation or liability to Developer, the right 9.2.4.1 Issue Directive Letters to Developer regarding traffic management 9.2.4.2 Provide on the Project, via message signs or other means consistent with Good Industry Practice, non-Discriminatory traveler and driver information, and other public information (e.g. amber alerts), provided that the means to disseminate such information does not materially interfere with the functioning of the ETCS.
Patch Management All workstations, laptops and other systems that process and/or store County PHI or PI must have critical security patches applied, with system reboot if necessary. There must be a documented patch management process which determines installation timeframe based on risk assessment and vendor recommendations. At a maximum, all applicable patches must be installed within 30 days of vendor release.