Leachate Clause Samples

POPULAR SAMPLE Copied 1 times
Leachate. A. Do not allow leachate from its solid waste material to enter State Waters without providing known, available, and reasonable methods of treatment, nor allow such leachate to cause violations of Chapter 173-201A WAC or Chapter 173-200 WAC.
Leachate. Leachate shall be transferred to an appropriate above- grade holding tank or other permitted and constructed holding structure of a capacity sufficient to meet regulations. Leachate shall be handled and treated as required by federal, and state laws, regulations, and the applicable permits. Under no circumstances shall untreated leachate be allowed to escape the Landfill areas into the surface or ground waters of the County.
Leachate is discharged under a permit issued by the SBSA. The SBSA does random sampling and testing of the leachate discharge. All repeat test results forwarded by the SBSA have shown that the leachate discharge meets the SBSA criteria for discharge to the SBSA system without treatment.
Leachate. The characteristics and amount of leachate generated in the landfill shall be controlled by controlling the types of solid wastes accepted and by limiting the amount of infiltration. Infiltration of precipitation into the landfill shall be minimized by providing adequate drainage at all times, by covering the solid waste daily, by covering completed areas of waste placement with 1.2" of compacted earth as intermediate cover, and by establishing grass on the intermediate cover to promote runoff of surface water which would otherwise infiltrate the soil cover. The Company shall develop a leachate management plan which complies with the requirements contained in the South Wake Solid Waste Management Facility Permit To Construct Application, and includes, but is not limited to, the following: (1) routine inspection, monthly sampling and analytical testing; (2) maintenance of leachate collection system; and (3) leachate management contingency plan. The Company shall be responsible for the actual cost incurred for leachate treatment, pre-treatment, transportation, and disposal, including the pumping, handling and other disposal costs for the Landfill during the 25-year contract period. To maintain the integrity of the liner and leachate collection system, the first lift of solid waste in each phase of the landfill shall be placed from the top of the slope or thickened sand layer. Solid waste transport vehicles, earth moving equipment, wheel compactors and other wheel equipment shall operate only on the top of the lift or on a pad of compacted compressible municipal solid waste except as otherwise specified.
Leachate. Leachate characteristics shall be tested for certain basic water quality parameters (BOD, suspended solids and certain metals) until a basic trend is established. Leachate shall be transferred to an appropriate above grade holding tank of a capacity sufficient to contain 10 days of leachate generation and then trucked to an appropriate disposal area outside of County on a daily basis or otherwise disposed of as permitted by federal, state and County authorities. Under no circumstances shall untreated leachate be allowed to escape the Landfill areas into the surface or ground waters of County. A back up leachate pump shall be available on site at all times. If a tank truck is unavailable at the site, a replacement truck must be available on site within three days.
Leachate. 1) VOCs; Spring and Fall events. 2) General Geochemical Parameters; Spring and Fall events. 3) Total Metals; Spring and Fall events. 4) Field Parameters; Spring and Fall events.
Leachate. VOCs; Spring and Fall events.
Leachate. The liquid by-product of the decomposition of waste. Its pollution potential is a function of the original waste.

Related to Leachate

  • Recycling If this Agreement provides for the purchase or use of goods specified in PCC 12207 (for example, certain paper products, office supplies, mulch, glass products, lubricating oils, plastic products, paint, antifreeze, tires and tire-derived products, and metal products), this section is applicable with respect to those goods. Without limiting the foregoing, if this Agreement includes (i) document printing, (ii) parts cleaning, or (iii) janitorial and building maintenance services, this section is applicable. Contractor shall use recycled products in the performance of this Agreement to the maximum extent doing so is economically feasible. Upon request, Contractor shall certify in writing under penalty of perjury, the minimum, if not exact, percentage of post consumer material as defined in the PCC 12200, in such goods regardless of whether the goods meet the requirements of PCC 12209. With respect to printer or duplication cartridges that comply with the requirements of PCC 12156(e), the certification required by this subdivision shall specify that the cartridges so comply.

  • Wastewater investments in the construction, material enhancement, or renewal of infrastructure that supports wastewater and storm water collection, treatment, and management systems. Note: Investments in health infrastructure (e.g., hospitals, long-term care facilities, convalescent centres, and senior centres) are not eligible. Eligible Expenditures will be limited to the following: 1. Infrastructure investments – expenditures associated with acquiring, planning, designing, constructing, or renovating a tangible capital asset and any related debt financing charges specifically identified with that asset. 2. Capacity-building costs – for projects eligible under the capacity-building category only, expenditures associated with the development and implementation of: • Capital investment plans, integrated community sustainability plans, integrated regional plans, housing needs assessments, or asset management plans; • Studies, strategies, systems, software, third-party assessments, plans, or training related to asset management; • Studies, strategies, systems, or plans related to housing or land use; • Studies, strategies, or plans related to the long-term management of infrastructure; and • Other initiatives that strengthen the Recipient’s ability to improve local and regional planning. 3. Joint communications and signage costs – expenditures directly associated with joint federal communication activities and with federal project signage.

  • Storage The ordering agency is responsible for storage if the contractor delivers within the time required and the agency cannot accept delivery.

  • Waste Borrower shall not commit or suffer any waste of the Property or make any change in the use of the Property which will in any way materially increase the risk of fire or other hazard arising out of the operation of the Property, or take any action that might invalidate or give cause for cancellation of any Policy, or do or permit to be done thereon anything that may in any way impair the value of the Property or the security of this Security Instrument. Borrower will not, without the prior written consent of Lender, permit any drilling or exploration for or extraction, removal, or production of any minerals from the surface or the subsurface of the Land, regardless of the depth thereof or the method of mining or extraction thereof.

  • Transport The Parents consent to the Pupil travelling by any form of public transport and / or in a motor vehicle driven by a responsible adult who is duly licensed and insured to drive a vehicle of that type.