LEED Design and Construction Obligations. (a) Project Co shall perform the Works so as to achieve the prerequisites and credits required to achieve the LEED-NC Silver Rating and in so doing, Project Co shall (i) at a minimum, endeavour to achieve the prerequisite credits under the LEED-NC Rating System provided for in Section 4.10 of Part 4 of Schedule 15 – Output Specifications, and (ii) achieve the Mandatory and Targeted LEED-NC credits identified in Section 4.10 of Part 4 of Schedule 15 – Output Specifications.
Appears in 1 contract
Sources: Project Agreement
LEED Design and Construction Obligations. (a) Project Co shall perform the Works so as to achieve the prerequisites and credits required to achieve the LEED-NC LEED Silver Rating and in so doing, Project Co shall (i) at a minimum, endeavour to achieve the prerequisite mandatory prerequisites and credits under the LEED-NC LEED Rating System provided for in Section 4.10 2.14 of Part 4 2 of Schedule 15 – Output Specifications, and (ii) achieve the Mandatory and Targeted LEED-NC Project specific essential LEED credits identified in Section 4.10 2.14.2 of Part 4 2 of Schedule 15 – Output Specifications.
Appears in 1 contract
Sources: Project Agreement