Less than Significant Impact. The project includes the construction of upland mound areas that could impede or redirect floodflows in the Yolo Bypass. However, as noted above in the discussion in Section (d), the hydrology report, and the County’s peer review of it, concluded that only minor local changes in the water surface elevation or water velocities during the most probable 100-year flood would occur due to the project.